Laserfiche WebLink
<br />standArd Project Flood (Cont'd). the geographic region involved, excluding <br />extremely rare combinAtions. Standard Project Flood magnitudes usually <br />rAnge from 40 to 60 percent of Maximum Probable Flood estimates. <br /> <br />. <br /> <br />" <br /> <br />3 <br />