My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02638
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:01 PM
Creation date
10/4/2006 11:01:59 PM
Metadata
Fields
Template:
Floodplain Documents
County
Montrose
Community
Montrose
Stream Name
Uncompahgre River
Basin
Gunnison
Title
Montrose Flood Control and Drainage Plan
Date
3/1/1981
Prepared For
Montrose
Prepared By
Gingery Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />of SO years. The cost of upgrading the cxistinr, system in order to .last <br />SO years would not be encountered if the proposed Flood Control Plan <br />was constructed. This savings is the advanced replacement benefit. <br />For Montrose Arroyo, the total average annual damages (area under <br /> <br />the damage - frequency curve) are $198,000 and the residual damages are <br /> <br /> <br />$15,000. This yields a difference, or reduction in damages for the project <br /> <br /> <br />of $183,000. Adding approximately one percent of the estimated construction <br /> <br /> <br />cost for employment benefits, or $23,000, and $4,670 for annual advanced <br /> <br /> <br />replacement benefits, the total average annual benefit is $210,670. <br /> <br /> <br />For Cedar Creek, the average annual damages are $24,000 and the <br /> <br /> <br />residual damages are $3,500. The reduction in damages is a differen'ce <br /> <br /> <br />of $20,,500. Adding employment benefits of approximately one percent of <br /> <br /> <br />project construction costs, or $880, and $220 for annual adv'-U1ced replacement <br /> <br /> <br />benefits, the total average annual benefit amounts to $21,600. <br /> <br />Average Annual Project Costs <br />Average annual costs include amortization of construction costs for <br /> <br />construction of the project plus applic:able operation and maintenance <br /> <br /> <br />costs. Amortization of capital costs for construction on an equal <br /> <br /> <br />installment basis is a function of two varia,bles: project life and <br /> <br /> <br />the interest rate. The useful life for flood control proj ects is typically <br /> <br />50 years. <br /> <br />The interest rate is a function of the source of money. In the private <br /> <br /> <br />sector, the interest rate ca.n vary considerably and will probably not be below <br /> <br /> <br />ten percent. A loan from the Federal Government, such as Farmers Home <br /> <br />Administration, may be as 10w as five percent. <br /> <br />, , <br />
The URL can be used to link to this page
Your browser does not support the video tag.