Laserfiche WebLink
<br />- --,flood Control P1 an was constructed, Thi s savi ngs is the advanced rep 1 ace- <br /> <br />ment'be!1,efitS <br />" . <br />The be-nefit/ t1.o for the sel ected pIa 11 for Montrose Arroyo is <br />" <br />$202,67U,in a yage annual benefits <br />U7, or $173,760 i.~ average annual costs <br />On Cedar creek,' the annual/cdfL1o ;.on,!;truct the selected Flood <br />Control Plan is $6,680. The benefits a~rjveqfrpm the Plan are $24,000 <br />in reduced average annual damages and $220 r)~r lea:0i ~1/jdVa~Ced replacement: <br />benefits, The benefit/cost ratio is 3 63 or $24,220 in a~.s:a~annual benefits <br />. ~,680 in av age annual costs <br /> <br />For both Montrose Arroyo and Cedar Creek, the benefits E'xceed the costs. <br /> <br />It would, therefore, be in the interest of the City of Montrose to proceed <br /> <br />with the selected Flood Control Plans as soon as possible. <br /> <br />- 3~) - <br />