My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02638
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:01 PM
Creation date
10/4/2006 11:01:59 PM
Metadata
Fields
Template:
Floodplain Documents
County
Montrose
Community
Montrose
Stream Name
Uncompahgre River
Basin
Gunnison
Title
Montrose Flood Control and Drainage Plan
Date
3/1/1981
Prepared For
Montrose
Prepared By
Gingery Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Cost Estimates <br /> <br />!')~~O <br />The estimated costs of the Flood Control Plans arl~ based on contractor <br /> <br />" <br /> <br />construction prices, including overhead and profit. <br /> <br />Unit prices are based on data from the Colorado Department of High- <br />ways (Reference 10), and increased 10% to account for regionally higher <br />prices in Montrose. <br /> <br />TABLE g <br />UN IT COSTS <br /> <br />Structural Excavation and Backfill <br /> <br />$ l1/cubic yard <br /> <br />Structural Concrete <br /> <br />2:75/ cubi c ya rd <br /> <br />Rock Ri prap <br />Bridge - 2-Lane <br />Bri dge - 4-Lane <br /> <br />;'2/cubi c yard <br /> <br />IW/ squa re foot <br /> <br />1~4/square foot <br /> <br />Aspha 1t <br /> <br />lID/cubic yard <br /> <br />Culvert Removal <br /> <br />~i5/foot <br /> <br />Final construction costs were calculated using these unit prices and <br /> <br />the detailed material quantities calculated For each study reach. Unit <br /> <br />costs were estimated using common materials and construction techniques <br /> <br />to produce the drainage facilities descr-ibecl on the prE,liminary plan <br />drawings. The use of alternate materials and construction methods could <br /> <br />result in a savings over what is presented here. A detailed study to <br /> <br /> <br />evaluate all possible design alternatives will be left for final design. <br /> <br />- 31 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.