Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Frank Hess, 806 23rd Street <br />Mud covered gravel walkway and driveway - new gravel <br />Time spent <br />Esther Kinnier, 2101 Blake Avenue <br />Yard was covered with debris, causing loss of garden <br />and 1 awn <br />Lawn reseeded at cost of <br />Ten days or more was spent washing away the mud and red dust <br />Nick Massaro, 508 25th Place <br />Two feet of water and mud in the basement recreation room, <br />water an::! mud on some carpets upstairs, garage filled with <br />1 1/2 feet of water and mud. Storage shed and contents <br />completely demolished, rock an::! debris up to 6 ft. on side <br />and front yard. Driveway gravel completely washed away. <br />Time spent in clean-up was: garage - 4 people - 2 days each <br />basement - 12 people - 2 days each <br />Mi nor damage was noted on some of the garage board and <br />bat siding <br />Basement recreat ion room had to be repai nted, carpets <br />cleaned, window replaced <br />Pool table had debris splattered on it, chest of drawers <br />soaked, bed ruined, books lost which were not replaceable. <br />Freezer in garage repaired <br />Yard and shrubs total loss <br />Costs - Bulldozer <br />Paid help <br />Mi sc. equi pment <br />Gr aye 1 rep I aceme nt <br /> <br />$ 100.00 <br />10 hours <br /> <br />$ 100.00 <br />$ 50.00 <br /> <br />$ 25.00 <br /> <br />$ 263.29 <br /> <br />$ 80.00 <br /> <br />$ 567.00 <br />$ 225.00 <br />$ 41. 63 <br />$ 19,35 <br />