Laserfiche WebLink
<br />IV. Current WOlrkload/Capacity <br /> <br />A. Availability <br /> <br />ICON's present workload enables us to offer significant availability of our Project Manager, <br />Senior Engineers and other professionals. The following chart specifies the percent of time <br />that each has available for the duration of this contract. <br /> <br />ProJect Ass~gnment Name A a~lability <br /> <br />Principal Penn Gild <br />Project Manger Mike Vins <br />Project Engineer Curt Neuti <br />Project Engineer Rick Rom <br />Other Professionals See Organ <br /> <br />ersleeve <br />011 <br />eld <br /> <br />e <br />ization Chart <br /> <br />20% <br />40% <br />-----~-- <br />50% <br />------- <br />25% <br />40-60% <br /> <br />III addition, our organizational structure enables us to offer the CWCB the f1exibility to use <br />our team's talented pool of professionals on an as-needed basis. We can make our staff <br />available for 100% of their time for when your needs require that level of commitment and <br />can also provide them at a lower level of utilization when your needs are not as great. This <br />offers the CWCB a talented pool of professionals in the appropriate disciplines to meet <br />fluctuating needs. <br /> <br />18 <br />