My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02476
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:34 PM
Creation date
10/4/2006 10:55:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Fremont
Community
Florence
Stream Name
Oak Creek
Basin
Arkansas
Title
Florence Community File
Date
1/1/2001
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DRAFT <br /> <br />more thorough hydraulic analysis employed in this latest study showed the effects of the <br />constrictions more accurately leading to a larger floodplain. Velocities were found to be slower <br />than in previous analyse:; which also led to greater flood depths. The result was that less water <br />really did produce a larger floodplain. <br /> <br />Modifications to the Floodplain <br /> <br />In the spring of 1993 we learned from the LMMP study contractor that there had been some <br />filling in the Oak Creek floodplain, in the area being studied, In of 1993 a FEMA <br />representative visited Florence and discussed the filling activity with City officials. In June of <br />1993 Brian Hyde toured the site on behalf of the CWCB and then attended a meeting with City <br />officials, FEMA officials and others. Despite the fact that the City and the developers were <br />aware of the LMMP study in progress, they did not notify the study contractor, FEMA or the <br />CWCB of the filling acti vity as it was going on. From appearances two feet or more of fill have <br />been imported to the site, so the topographic change is substantial. We believe that the filling <br />began sometime after the May 1992 meeting and was completed by the spring of 1993. <br /> <br />Some understanding of the peculiarities of this particular floodplain would explain the importance <br />of the change brought about by this filling. As Oak Creek enters Florence, it encounters some <br />undersized bridges. About half of the flow is diverted either to the right (east) or to the left <br />(west). The diverted water flows overland at depths of about two feet or less. Some water <br />returns to the channel and some does not. The development site represents one large area for <br />this overland flow. When a large geographic area is subject to flooding, even if it is shallow <br />flooding, the amount of water is substantial. In this particular case the amount of water is in the <br />thousands of cfs, so the situation is not trivial. If such a large area is filled deep enough in order <br />to protect it from flooding, the water that would flow there would have to go somewhere else, <br />unless specific provisions are made to convey it safely through the filled area, We are not aware <br />of any engineering that guided the filling, so we assume no provisions were made for the water <br />that would be diverted by the filling activity. Where that water would go has not yet been <br />determined. <br /> <br />Floodplain Development Permits <br /> <br /> <br />Communities that participate in the National Flood Insurance Program, as Florence does, are <br />obliged to require floodplain development permits be obtained prior to any "development" in the <br />floodplain. The permit application materials submitted by the proponent have to include some <br />technical information, That technical information has to be sufficient to allow the local <br />permitting official to determine whether the proposed activity would comply with the <br />community's regulations. The need to require floodplain development permits has been conveyed <br />to the City Manager of Florence on several occasions, Mark Matulik has conducted visits on <br />and told the City Manager of that. FEMA officials and <br />other CWCB representatives have also told the City that. The most recent time this message was <br />conveyed was at the June 1993 meeting mentioned above and in the July 1993 letter that <br />followed that meeting. Despite all of those efforts to remind the City of what is in their own <br />regulations, there is still no permit for the filling that has already transpired. To our knowledge <br />no permit application ha" been submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.