Laserfiche WebLink
<br /> <br />. <br /> <br />e <br /> <br />. <br /> <br />Colorado Wah!r Conservation Board <br />Flood Control and Floodplain Management Section <br /> <br />I~I Detail- Rule 5 <br /> <br />CHECKLIST FOR REVIEW OF FLOODPLAIN INFORMATION <br /> <br />A. Topographic Base Mapping <br /> <br />1. Work Map Type: <br /> <br />2. Features: <br /> <br />a. <br />b. <br />c. . <br />d, / <br />e. <br /> ./ <br /> <br />3. Ground Control: <br /> <br />4. <br /> <br />Contour Interval: <br /> <br />5. Scale: <br /> <br />6, Spot Elevations: <br /> <br />7, Cross Sections: <br /> <br />/' <br /> <br />,/ <br /> <br />-6- <br /> <br />I~I Approximate - Rule 6 <br /> <br />t/ line <br />orthophoto <br />recti Fied photo <br />USGS quad map <br />date of photo <br />date of map <br />prepared by <br /> <br />natural, etc. <br />cultural, etc, <br />hydrOlogic, etc. <br />reference. etc, <br />geographic, etc, <br /> <br />USC&GS or USGS <br />datum of 1929 <br />other datum <br />number of triangulation stations <br />order of leveling <br />control markers on map <br />land surveyor No, <br /> <br />'2-. <br /> <br />feet <br />supplemental contours feet <br /> <br />- <br /> <br />/ <br /> <br />original scale <br />1 inch equals ____ feet <br /> <br />road intersections <br />near buildings <br /> <br />photogrametric methods <br />from map contours <br />from field surveys <br />perpendicular to flow <br />at changes in area <br />at changes in gradient <br />at bridges <br />at confluence with tributaries <br />at control sections <br />maximum percent change in E,G,L, slope <br />additional sections needed? <br />shown on work maps <br />shown on published maps <br />