Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />]- <br />" <br />I <br />I <br />II <br />I <br />I. <br />I <br />, <br />I <br />I <br />I <br />l <br />1'.'1 <br />", <br />..... <br />.~" <br /> <br />LIST OF FIGURES <br />AB Lateral Unit <br />Water Supply Study <br /> <br />. <br /> <br />Figure title <br /> <br />Page <br /> <br />============================================================================ <br /> <br />2.1 Uncompahgre Reclamation Project. <br /> <br />2.4 Duration curve for Uncompahgre River above <br />South Canal. <br /> <br />2.2 <br />2.3 <br />2.10 <br />2.11 <br />2.15 <br />3.2 <br />3.6 <br />3.10 <br />. <br /> <br />2.2 Gunnison River Basin. <br /> <br />2.3 Duration curve for Gunnison River above <br />Tunnel. <br /> <br />2.5 Schematic of pre-project irrigation operations <br /> <br />3.1 Schematic of proposed Project. <br />3.2 Schematic of post-project operations <br />3.3 Duration curves of flows entering Black Canyon <br /> <br />. <br /> <br />v <br /> <br />r <br />t~ <br />