My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02454
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:30 PM
Creation date
10/4/2006 10:54:14 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Basin
Gunnison
Title
Uncompahgre Valley Reclamation Project - Hydropower - Part 2 - AB Lateral Unit Water Supply Study
Date
12/1/1988
Prepared For
Montrose Partners and Ucompahgre Valley Water Users Association
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />\1 <br />II <br />I <br />,e <br />I <br />"2?~~~~f1 <br />',:'Ji{i_~~,l~-1"--",!"\ <br /> <br />TABLE OF CONTENTS <br />AB Lateral Unit <br />Water Supply Study <br /> <br />Table of Contents <br />List of Tables <br />List of Figures <br /> <br />Section title <br /> <br />ii <br />iv <br />v <br /> <br />==~=============_========~=============_========================z=======:=== <br /> <br />Page <br /> <br />Section 1.0 Introduction <br /> <br />1.1 Purpose of report <br />1.2 Project description <br />1.3 Planned operating criteria <br />1.4 Facility alternatives <br />1.5 Acknowledgements <br /> <br />Section 2.0 Description of Irrigation System <br /> <br />2.1 Canal system description <br />2.1.1 South Canal <br />2.1.2 West Canal <br />2.1.3 Montrose and Delta Canal <br />2.1.4 Loutzenhiser Canal <br />2.1.5 Selig Canal <br />2.1.6 Other canal systems <br /> <br />2.2 System inflows <br />2.2.1 Gunnison River <br />2.2.2 Uncompahgre River <br />2.2.3 Return flows <br /> <br />2.3 Operational constraints <br />2.3.1 Gunnison River instream flows <br />~.3.2 Gunnison Tunnel capacity <br />2.3.3 Uncompahgre River flooding <br /> <br />2.4 Water budget model for pre-Project conditions <br />2.4.1 Model description <br />2.4.2 Model formulae <br /> <br />2.5 Results of analysis <br />2.5.1 Water balance <br />2.5.2 Comparison of historic and predicted flows <br />2.5.3 Correlation analyses of Reclamation's Gunnison <br /> <br />ii <br /> <br />1.1 <br />1.1 <br />1.2 <br />1.2 <br />1.3 <br /> <br /> 2.1 <br /> 2.4 <br /> 2.6 <br /> 2.7 <br /> 2.7 <br /> 2.7 <br /> 2.7 <br /> 2.8 <br /> 2.9 <br /> 2.12 <br /> 2.13 <br /> 2.13 <br /> 2.13 <br /> 2.14 <br /> 2.17 <br /> 2.18 <br /> 2.18 <br />flows 2.20 <br /> <br />._, , <br />;-",' -,'," <br />
The URL can be used to link to this page
Your browser does not support the video tag.