Laserfiche WebLink
<br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />\1 <br />II <br />I <br />,e <br />I <br />"2?~~~~f1 <br />',:'Ji{i_~~,l~-1"--",!"\ <br /> <br />TABLE OF CONTENTS <br />AB Lateral Unit <br />Water Supply Study <br /> <br />Table of Contents <br />List of Tables <br />List of Figures <br /> <br />Section title <br /> <br />ii <br />iv <br />v <br /> <br />==~=============_========~=============_========================z=======:=== <br /> <br />Page <br /> <br />Section 1.0 Introduction <br /> <br />1.1 Purpose of report <br />1.2 Project description <br />1.3 Planned operating criteria <br />1.4 Facility alternatives <br />1.5 Acknowledgements <br /> <br />Section 2.0 Description of Irrigation System <br /> <br />2.1 Canal system description <br />2.1.1 South Canal <br />2.1.2 West Canal <br />2.1.3 Montrose and Delta Canal <br />2.1.4 Loutzenhiser Canal <br />2.1.5 Selig Canal <br />2.1.6 Other canal systems <br /> <br />2.2 System inflows <br />2.2.1 Gunnison River <br />2.2.2 Uncompahgre River <br />2.2.3 Return flows <br /> <br />2.3 Operational constraints <br />2.3.1 Gunnison River instream flows <br />~.3.2 Gunnison Tunnel capacity <br />2.3.3 Uncompahgre River flooding <br /> <br />2.4 Water budget model for pre-Project conditions <br />2.4.1 Model description <br />2.4.2 Model formulae <br /> <br />2.5 Results of analysis <br />2.5.1 Water balance <br />2.5.2 Comparison of historic and predicted flows <br />2.5.3 Correlation analyses of Reclamation's Gunnison <br /> <br />ii <br /> <br />1.1 <br />1.1 <br />1.2 <br />1.2 <br />1.3 <br /> <br /> 2.1 <br /> 2.4 <br /> 2.6 <br /> 2.7 <br /> 2.7 <br /> 2.7 <br /> 2.7 <br /> 2.8 <br /> 2.9 <br /> 2.12 <br /> 2.13 <br /> 2.13 <br /> 2.13 <br /> 2.14 <br /> 2.17 <br /> 2.18 <br /> 2.18 <br />flows 2.20 <br /> <br />._, , <br />;-",' -,'," <br />