My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02442
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:28 PM
Creation date
10/4/2006 10:53:44 PM
Metadata
Fields
Template:
Floodplain Documents
County
Rio Grande
Community
South Fork
Stream Name
South Fork Rio Grande River
Basin
Rio Grande
Title
Flood Hazard Study
Date
10/1/1980
Prepared For
South Fork
Prepared By
USDA Soil Conservation Service
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />1I <br /> <br />The )/.1t;onal flood Insuranc" Pro>:."," """-" tll.. floodw"y <QMept In in' <br /> <br />cOClIputed!o, f"ture refer..nce. lIecauseofchel4fs"aOlOuntofcOUlputational <br /> <br />rate studies for co...unities part ic ipatin~ ;n its' rel!;ul3< programs. <br /> <br />I <br /> <br />9 <br /> <br />dau, floodll"Y ."formation is include<! in Appendix II U>l>uaee eo this <br /> <br />report. Data;,.".nt"b"ta. for"sndinclud...floodw"ywidths,c'ussaec- <br /> <br />StructuraL Flood Control Heasures <br /> <br />There..... noexlningQr currenety planned ftoodccntrolnruccures in <br /> <br />I <br /> <br />II <br /> <br />tion"l fl.,.""rea, "nd aller'".''' velocities. C","puUtions are for an increase <br /> <br />t':1e study ate... <br /> <br />in .isect.."te. sudace elevations in 0.5' increments ftoIUO.O' to 1.5' <br /> <br />Mo.t of the buildinl!;s in the study a...., su.ceptible toche 100-yeu <br /> <br />I <br /> <br />3 <br /> <br />abolle the lOa-year flood. <br /> <br />flood, <lte in shalloll portions of the flood plain .000 potential da.....ges Can <br /> <br />I <br /> <br />9 <br /> <br />FLood Insurance <br /> <br />be lessened vith fLood proofin~ ~..sures, <br /> <br />Tke National Flood Insurance "ct of L968 (Titte XIII of rhe Housin~ and <br /> <br />FLood Warnin~ and Flood Forecastin~ Systems <br /> <br />o <br /> <br />Urban Development Act, P.L. 90-448) recognized the necessity for flood plain <br /> <br />The National Oceanic and Atrnoapheric Ad~inistr.tion (NOAA) through its <br /> <br />I <br /> <br />Ol8.nage""'nt. This Ac:tmakes federallyaubsidized insurance available to <br /> <br />National Weather Service (Ii'JS), "",inta!n.. year-around aurveillance of <br /> <br />I <br /> <br />o <br /> <br />citizens in co~unities that adopt regulations controttin8 future develop- <br /> <br />ueather and fLood conditions. Olily weatker forecasts,are i..ued through <br /> <br />Ii <br /> <br />...ents of their flood phin. In respect to encroack....nt on tile flood plain, <br /> <br />the NWS and di.8e~inated by radio and television .tation.. A general aLert <br /> <br />I <br /> <br />the regulations require: <br /> <br />to tl,edangerof flash floodi.ng is one of the services orovided by the <br /> <br />1 <br /> <br />J <br /> <br />Ne...residential construction Or subs tant ia1 i..prove....ntofexist- <br />ing ho",e~ must have the lowest floor level above the elevation of the <br />100-year flood. <br /> <br />National Westher Service. <br /> <br />if <br /> <br />Gen"ral forecasts of soo_e1t Nnoff for the RioCrandeare....de <br /> <br />I <br /> <br />Non-res idential construction ,"ust ....et the 'aroe st~ndard or be <br />flood proofed to tl,at leve). <br /> <br />cooperatively but publisl,ed separately by tke NWS and the Soil Conservation <br /> <br />~ <br /> <br />The 1968 Act benefits <WIlen of structures already in the flood-prone <br /> <br />Service. Strea..Uowforecastinll.isbasedonsevera1 factorsincludin& <br /> <br />I <br /> <br />ue...... by providing insurance thllt had been unavailable through private <br /> <br />precipitation, ~ater content in the mountain sno~pack, and soil moisture <br /> <br />:J <br />II <br /> <br />......~.n;..c , <br /> <br />'f't.eA':t':!'!!!t'!!':! <br /> <br />e ~~~~e~eti~~ ~rc~r=~ of i~=~r==== <br /> <br />.u...~ <br />_""'''Uk <br /> <br />!tvv': <br /> <br />conditicms on the ~"tershed. The forecasts 4<e .."de I>rilll8rily for ..sti.."t- <br /> <br />J <br /> <br />d"""'v,eby the privnte flood insurllnce industry and the federa!.govcrnOlCnt. <br /> <br />in.o:wlltcr aupply for irriltation, industrial,..unicipa1andotheruseA; <br /> <br />1 <br /> <br />The unincorporated areAs of ~io Grande County are psrticipatinll. in the <br /> <br />hn~ever, the data is ...lao used to indicate potential flooding fro.. sno""",,lt <br /> <br />I <br /> <br />Federal Emergency Management "",ency's National Flood Insurance Progta...1 <br /> <br />[unoff, <br /> <br />Flood i"'U[An"e is available to owners and occupants of all buildings, <br /> <br />EVAcuation Plan <br /> <br />11 <br />- <br /> <br />"",bilehCXlle. and their contents. <br /> <br />An "Emergency EVAcuation and Opeution Plan" should provide for <br /> <br />a l"r~ in~ the pub L ic ot potent iaL t lood in~. and coordinat inll. co",",uni ty and <br /> <br />I <br /> <br />lFo....erly under HUD-The functions of the !'edenllnauunce <br />Administration,U.S. Dep3rt....ntofllousinga"dUrbsnOevelop""'nt...eff: <br />transferred to the newly eatabtiahed r.edcra1Emergency Manage.... ntAgency, <br />Aprit3,1979. <br /> <br />,,""nty s~rdees durin~ ~"(!.I'''~(!ney. Phn imolerncnt"tion dudn~ tl,~ ti'll.e of <br /> <br />a <br /> <br />22 <br /> <br />11 <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.