My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02430
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:26 PM
Creation date
10/4/2006 10:53:19 PM
Metadata
Fields
Template:
Floodplain Documents
County
Fremont
Community
Florence
Stream Name
Oak Creek
Basin
Arkansas
Title
Oak Creek Floodplain and Floodway
Date
8/3/1992
Prepared For
FEMA
Prepared By
Love & Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Tom Smith <br />Oak Creek Floodplain and Floodway - Florence, Colorado <br />FEMA LMMP Contract No. EMW-90-C-3132 <br />Page 2 <br /> <br />irrigation canal alignment. This combined flow of 3,440 cfs continues east along the railroad to <br />the low point in the tracks at about Frazier Avenue. The flow spills continuously over the <br />railroad along this length of track. <br /> <br />Downstream of the D&RGW, the lOO-year floodplain is delineated using three HEC-2 models: <br />main channel, right overbank area, and left overbank area. wee models are needed to defme the <br />floodplain due to the split flow nature of the floodplain and the topography in the area. The flow <br />in the left overbank area is estimated as that portion of the flow over the railroad from a point <br />200' west of the bridge crossing. This point was selected by analysis of the downstream <br />topography. The left overbank flow was estimated using a sloping weir equation and the water <br />surface elevation at cross section L given in the main channel model (see Figure 1). The flow in <br />the left overbank area is approximately 2,720 cfs. <br /> <br />The limit of the left overbank floodplain on the west is defmed as the flow path from the <br />D&RGW tracks to the Arkansas River. The left overbank area model estimates the depths of <br />flow. At cross section E, the water surface in the main channel is about the same as in the left <br />overbank area and the floodplains become hydraulically connected. Thus, it was assumed that <br />the majority of the flow in the left overbank area returns to the main channel at cross section E. <br />A portion of the flow, however, remains in the left overbank area creating an area of shallow <br />flooding to the Arkansas River. <br /> <br />The main channel flow just downstream of the D&RGW is approximately 9,840 cfs. Because of <br />the inadequate capacity of the 2nd Street and 3rd Street bridge crossings to convey the main <br />channel flow, a portion of the flow spills to the east into the right overbank area from cross <br />sections H to K. The spill was quantified using the split flow option in the HEC-2 model. The <br />amount of spill is about 3,880 cfs. This split flow combines with the 3,440 cfs which spills over <br />the railroad tracks east of the main channel. As the combined flow in the right overbank of 7,320 <br />cfs moves toward the Arkansas River, a portion of the combined flow spills back into the main <br />channel from cross sections C to G. This split flow is quantified using the split flow option in the <br />HEC-2 model. <br /> <br />At cross sections A and B, the floodplains for the right overbank area and the main channel are <br />hydraulically connected; and, thus, the total flow is used in the main channel model to determine <br />the lOO-year floodplain. A general schematic of the hydraulic analysis is shown in Figure 1. <br /> <br />The Manning's roughness coefficient is 0.045 in the main channel and ranges from 0.05 to 0.15 <br />in the left overbank area and 0.09 to 0.15 in the right overbank area depending on the degree of <br />urbanization. <br /> <br />.' <br /> <br />If the Oak Creek floodplain were to be defined using one model which includes the main channel <br />and overbanks as opposed to three separate models, the HEC-2 program shifts the flow in the <br />overbanks and main channel from one overbank to the other. From examining the topography in <br />the area, the flow cannot physically shift from one overbank to another; thus, a single model <br />would not realistically defme the floodplain. <br /> <br />Floodway <br /> <br />The flood way limits will be defined based on FEMA's one foot rise criteria. If the floodway is <br />defined using one HEC-2 model and the floodplain is defmed using the hydraulic analysis for <br />three separate HEC-2 models, the water surface elevations will not be directly comparable to <br />determine the one foot rise. Also, for a floodway defmed using one HEC-2 model, the HEC-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.