My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02395
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:20 PM
Creation date
10/4/2006 10:52:08 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Colorado Erosion Control Manual
Date
11/1/1992
Prepared For
State of Colorado
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />.---- <br /> <br />FIGURE 2 - I River Classification (Replinted from Brice, 1983) 5 <br />FIGURE 2 - 2 Transitions s<:clions from a bend to a crossing. (Reprinted from Peterson, <br />1986) 6 <br />FIGURE 2 - 3 Helicoidalllow in a bend. (Reprinted from Peterson, 1986) 6 <br />FIGURE 2 - 4 Clear water rei"""" below a dam (Reprinted from Chang, 1988) 10 <br />FIGURE 3 - I Types of ma~s failure of banks (Reprinted from Hemphill and Bramley <br />89) 20 <br />FIGURE 4 - I Typical revetmenl with slone 28 <br />FIGURE 4 - 2 Sack Revelmenl 29 <br />FIGURE 4 - 3 Soil covered ripm]} 30 <br />FIGURE 4 - 4 Staked Riprap 31 <br />FIGURE 4 - 5 Concrete mattresses 32 <br />FIGURE 4 - 6 Concrete pavement 32 <br />FIGURE 4 - 7 Gabion 34 <br />FIGURE 4 - 8 Geotextiles 35 <br />FIGURE 4 - 9 Tire mat 36 <br />FIGURE 4 - 10 Tree and Bomh Reve1ment 37 <br />FIGURE 4 - 11 lIardpoinl 39 <br />FIGURE 4 - 12 Live log crib 40 <br />FIGURE 4 - 13 Crib Dellector 41 <br />FIGURE 4 - 14 Dike 42 <br />FIGURE 4 - 15 Fence 44 <br />FIGURE, 4 - 16 Drop grade control structure 47 <br />FIGURE, 4 - 17 Brush Mat RI,vetment 50 <br />FIGURE, 4 - 18 Cellular concrete blocks 50 <br />FIGURE. 4 - 19 Timber and! vegetation bulkhead 51 <br />FIGURE 5 - 1 Planning and preliminary design procedure 54 <br />FIGURE. 6 - 1 Typical hanlpoint 72 <br /> <br />Colol1lMjo Erosion Control Malnual <br /> <br />VII <br />
The URL can be used to link to this page
Your browser does not support the video tag.