Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />. <br /> <br />Design Procedure Form: Constructed Wetland Basin (CWB) . Sedimentation Facility <br />Sheet 3 of 3 <br /> <br />Designer: <br /> <br />Company: <br /> <br />Date, <br />Project: <br />Location, <br /> <br />John Doe I, P.E. <br />CloseNuff Engineering, Inc. <br />August 30, 2000 <br />Heavenly Views omce Park - PPD#3 <br />Castle Peaks, CO <br /> <br />vii). Minimum Bearing Bar Size (K1empTM Series, Table Sa-2) 1.00 In. x 3/16 In. <br />(Based on depth of WQCV surcharo~' <br />6. Basin Use for Quantity Controls (Check one or describe ~ .Other") x Detention within the facility <br /> Detention upstream of the facility <br /> Other: <br />7. Basin length to width ratio 2.50 (LNV) <br />8. Basin Side Slopes (Z, horizontal distance per un~ vertical) (horizontal/vertical) <br />9 Annual/Seasonal Water Balance (Onet has to be positive) Qjnllow 84.00 acre-feet/year <br /> Q~p 5.00 acre-feet/year <br /> QSeeplge 18.00 acre-feet/year <br /> an 5.00 acre-feet/year <br /> """_,, _n__" <br /> Q.... :......56.00 :': acre-feet/year <br />10 VegeJation (Check the method being applied or describe) X Native Grass <br /> Irrigated Turf Grass Side Slopes <br /> x Wetland Species in Pool* <br /> Other: <br /> *Oescribe Spectes Density and Mix!. <br /> Conult with a wetland plantlna <br /> sDeclallst <br /> <br />Notes: <br /> <br />UCD Feb 2000 BMP-CASFM Sem-Examples-97, CWB <br />