Laserfiche WebLink
<br />26 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 5. Notes on cross-sectional bank erosion for Table 4. <br /> <br />Cross <br />Section <br /> <br />Note <br /> <br />1. <br />3. <br />4. <br />5. <br />6. <br />7. <br />12. <br /> <br />West bank has eroded 12 ft since 1994. <br /> <br /> <br />East bank eroded 25 ft in 9 years. <br /> <br /> <br />The base of west bank is eroding but not the top. <br /> <br /> <br />East bank eroded 62 ft between 1986 and 1995. Then it was riprapped. <br /> <br /> <br />The erosion is just reaching the Cross Section, migrating from upstream. <br /> <br /> <br />East bank eroded lOft in 9 years. <br /> <br /> <br />The east bank is bare gravel, indicating erosion, but the surveys do not <br />indicate any. <br /> <br />13. <br /> <br />14. <br /> <br />18. <br /> <br />21. <br /> <br /> <br />22. <br /> <br />23. <br /> <br />24. <br /> <br />25. <br /> <br />26. <br /> <br />27. <br /> <br />29. <br /> <br />49. <br /> <br />East bank had eroded 11 ft in the previous three years, now it is stable. <br /> <br />The east bank was stable until 1995, then a small channel was eroded in it. <br /> <br />West bank had slight erosion of 5 ft in the last 5 years. <br /> <br />West bank eroded 5 ft between 1986 and 1988, but is stable since. <br /> <br />East bank eroded 4 ft between 1986 and 1991, but is stable since. <br /> <br />Cross Section 23 is under construction. It was a gravel pit in 1986. <br /> <br />East bank was reconstructed between 1986 and 1990, widening the river. <br /> <br /> <br />West bank has eroded 25 feet in 9 years. <br /> <br /> <br />West bank eroded 8 ft in 9 years. <br /> <br /> <br />East bank was remade since 1986, widening the river about 100 ft. <br /> <br /> <br />East bank was eroding slowly in 1986, but has been stable since. <br /> <br /> <br />East bank has stable top but eroding base. <br />