|
<br /> 40-Yr. 7% 40-Yr. 7% Annua
<br /> Annualized Annua 1 i zed Operat: i
<br />Entityl Design Construction Construction Land Land Mainten
<br />A I ternate Frequency Cost Cost Cost Cost _ Co~.1
<br />WHEAT RIDGE-
<br /> 10 $1,830,000 $137,000 $544,000 $38,100 $34,8
<br />Grass 25 , ,970,000 147,800 555,000 38,900 34,8
<br /> 100 2,349,000 176,200 582,000 40,700 34,8
<br /> 10 1,270,000 95,300 190,000 13,300 1,,5
<br />Improved 25 1,340,000 100,500 190,000 13,300 4,5
<br />Flood Plain 100 1,480,000 111,000 190,000 13,300 1,,5
<br />Estimated 10 1,850,000 139,000 350,200 24,500 34,8
<br />Opt: imum 25 1,990,000 149,000 359,800 25,200 34,8
<br />COlllbination 100 2,330,000 175,000 380,200 26,600 34,8
<br />
<br />LAKEWOOD
<br /> 10 388,7S0 29,200 43,200 3,000 6,9
<br />Grass 25 445,500 33,400 1+7,400 3,300 6,,9
<br /> 100 563,750 42,300 56,400 3,900 6,,9
<br /> 10 242,475 18,200 9
<br />Improved 25 267,825 20,100 9
<br />Flood Plain 100 326,850 24,500 9
<br />Estimated 10 258,750 19,400 1,8
<br />Opt imum 25 283,000 21,200 1,8
<br />Combination 100 338,850 25,400 1 ,:3
<br />"Based on aggregate probab 1 e dama~les
<br />
|