Laserfiche WebLink
<br />Tab I e <br />No. <br /> <br />I -I <br /> <br />1-2 <br /> <br />1-3 <br />1-4 <br />1-5 <br /> <br />11-1 <br />11-2 <br /> <br />II I-I <br />II 1-2 <br /> <br />I V-I <br />I V-2 <br /> <br />V 1-1 <br /> <br />\/11 -I <br />\/11-2 <br />\/11 -3 <br /> <br />\/11-4 <br /> <br />\/1 1-5 <br /> <br />\/11-6 <br />\/11-7 <br />V 11-8 <br />V 11-9 <br /> <br />I X-I <br /> <br />IX-2 <br />I X-3 <br /> <br />Ix-4 <br /> <br />X-I <br />X-2 <br /> <br />HA-I <br />HA-2 <br />HA-3 <br /> <br />LIST OF TABLES <br /> <br />Tit]e <br /> <br />Lena Gulch, 100-Year Flood Characteristics, Future <br />Basin Development <br />Estimated Annual Damages, Pr"esent Channel Condi tions <br />with Future Basin Development <br />Approximate Cost Estimate of Alternatives, Phase A <br />Al ternate Comparison - Lena G'Jlch, Pha"e A <br />Lena Gulch Master Plan Improvement, Co~,t Estimate <br /> <br />Lena Gulch, Tributary Area of Governmental Entities <br />Basin Parameters <br /> <br />100-Year Peak Flow Summary <br />100-Year Peak Flow Summary, Future Basin Development <br /> <br />Typical Structural and Furnisning Values <br />Annua I Damages, Presen t Channe I Cond it ions wit h <br />Future Basin Development <br /> <br />Approximate Estimate of Al ternatives <br /> <br />Phase A, Unit Prices 1973 <br />Annual Unit Costs for Operation and Maintenance <br />Annual Intangible Benefits, Grass-Lined Channel <br />Alternate <br />Annual Intangible Benefits, O'Jtimum Combination <br />Alternate <br />Annual Intangible Benefits, Impr-oved Flood Plain <br />Al ternate <br />Probable Annual Damages <br />Alternate Comparisons <br />Tax Benefit Determination <br />Al ternate Comparison - Lena Gulch <br /> <br />Connections to Consol idated Mutual Water Company, <br />Suppl ied by Maple Grove Reservoir <br />Annual Cost of Maple Grove Reservoi r <br />Water Supply Costs, Associated with the Denver Water <br />Board as an Alternative Source <br />Maple Grove Reservoir, Management Alternates <br /> <br />Phase B Unit Prices, June 1975 <br />Lena Gulch Master Plan Improvement, C05t E"timate <br />April,1975 <br /> <br />Lena Gulch Watershed Design Rainfal I <br />Infiltration Test Results <br />CUHP Basin Characteristics <br /> <br />Pa~ <br /> <br />1-4 <br /> <br />1-4 <br />1-5 <br />1-6 <br />1-8 <br /> <br />II -2 <br />11-9 <br /> <br />II 1-3 <br />II 1-12 <br /> <br />IV-3 <br /> <br />IV-9 <br /> <br />VI-7 <br /> <br />VII-3 <br />V 11-4 <br /> <br />VII-II <br /> <br />VII -12 <br /> <br />VI 1-13 <br />VII-16 <br />VII-17-18 <br />VII-19 <br />VII -20 <br /> <br />IX-2 <br />IX-3 <br /> <br />I X- 3 & 8 <br />I X-II <br /> <br />X-2 <br /> <br />X-3 <br /> <br />HA-3 <br />HA-5-6 <br />HA-9 <br />