Laserfiche WebLink
<br />The following organizations were contacted for additional information <br />during the study: the COE; the U.S. Geological Survey (USGS); the <br />U.S. SOil Conservation Service (SCS); the National Oceanic and <br />Atmospheric Administration (NOAA); the Colorado Department of High- <br />ways; the City of Pueblo; Pueblo County; Sellards and Grigg Consult- <br />ants, Inc.; KLH Engineers; Dames & Moore; and CF&I Steel Corporation. <br /> <br />No intermediate community coordination meeting was held for this <br />draft study. However, a copy of the draft study was provided to <br />community officials for their review. No problems were encountered. <br /> <br />The final community coordination meeting was held on December 18, <br />1984, and attended by representatives of FEMA, the study contractor, <br />and the community. All problems and conCerns raised at that meeting <br />have been addressed in this study. <br /> <br />2.0 AREA STUDIED <br /> <br />2.1 Scope of Study <br /> <br />This Flood Insurance Study covers the incorporated areas of the <br />City of Pueblo, Pueblo County, Colorado. The area of study is <br />shown on the Vicinity Map (Figure 1). <br /> <br />The Arkansas River was studied by detailed methods from upstream <br />of State Highway 227 (downstream of the corporate limits) to a <br />point approximately 1,500 feet downstream of State Highway 96. <br />The remainder of the river upstream of the detailed-study area was <br />studied by approximate methods. The detailed analysis was adopted <br />and revised by the study contractor from the previous COE study <br />(Reference 1). The upstream approximate analysis was adopted by <br />the study contractor from revisions made to the previous COE study <br />(Reference 1) by Dames & Moore. <br /> <br />Fountain Creek was studied by detailed methods from the mouth at <br />the Arkansas River (downstream of the corporate limits) to a point <br />approximately 3,500 feet upstream of State Highway 47. The remainder <br />of the creek upstream of the detailed portion was studied by approxi- <br />mate methods. Both the detailed and approximate analyses were <br />adopted by the study contractor from the previous COE study <br />(Reference 1). Dames & Moore revised the COE analysis for the <br />area from downstream of the Atchison, Topeka & Sante Fe Railway to <br />downstream of U.S. Highway 50. <br /> <br />The detailed analysis for the west bank overflow from Fountain <br />Creek was taken from a report prepared for the City of Pueblo by <br />the study contractor (Reference 2). <br /> <br />Fountain Creek East Bank OVerflow was studied by detailed methods. <br />The detailed analysis was performed by Dames & Moore. <br /> <br />2 <br />