Laserfiche WebLink
<br /> 2 <br /> ELEVATION DIFFERENCE FLOOD BASE FLOOD <br /> 1 BETWEEN 1% (lOO-YEAR) FLOOD AND <br />FLOODING SOURCE PANEL HAZARD ZONE ELEVATION 3 <br /> 10% 2% 0.2% FACTOR (FEET NGVD) <br /> (la-YEAR) (50-YEAR) (500-YEAR) <br />Arkansas River <br />Reach 1 0010 -3.7 -2.4 6.3 035 A7 Varies - See Map <br />Reach 2 0009,0010 -6.4 -2.6 5.8 065 AU Varies - See Map <br />University Park <br />Tributary <br />Reach 1 0003 -1.1 -0.5 1.4 010 A2 Varies - See Map <br />Reach 2 0003 -2.8 -0.8 3.3 030 A6 Varies - See Map <br />wild Horse-Dry Creek <br />Reach 1 0005 -5.1 -1.4 4.8 050 A10 Varies - See Map <br />Reach 2 0005 -7.8 -2.0 3.8 080 A16 Varies - See Map <br />Reach 3 0005 -5.6 -1. 7 5.5 055 All Varies - See Map <br />Reach 4 0005 -9.0 -2.9 6.1 090 A18 Varies - See Map <br />Lake Minnequa _4.44 <br />Reach 1 0013 N/A N/A 045 A9 4,802 <br />Shallow Flooding 0013 N/A N/A N/A N/A AO Depth 1, 2 <br /> <br />1 <br />Flood Insurance Rate Map Panel <br />4Difference Between 100-Year Flood <br /> <br />-I <br />=-- <br />aJ <br />..... <br />.... <br />U1 <br /> <br />2 . 3 <br />Welghted Average Rounded to Nearest Foot <br />and Average Lake Elevation <br /> <br />FEDERAL EMERGENCY MANAGEMENT AGENCY <br /> <br />CITY OF PUEBLO, CO <br />(PUEBLO CO.) <br /> <br />FLOOD INSURANCE ZONE DATA <br /> <br />ARKANSAS RIVER.UNIVERSITY PARK TRIBUTARY.WILD HORSE-DRY CREEK- <br />LAKE MINNEQUA <br />