Laserfiche WebLink
<br />I TABLE IV-2 (CONTINUED) <br />I PAGE 5 OF 5 <br />I Upstream of East 88th Avenue <br />Item Quantity Unit Price Cost <br />I Excavation, open, rural 2,300 cu.yd. 1.00 2,300 <br />Compacted embankment 150 cu .yd. 2.00 300 <br />I 18" riprap 2,200 tons 25.00 55,000 <br />Ri prap bedding 200 cu.yd. 10.00 2,000 <br />Gabions 775 cu .yd. 40.00 3LOOO <br />I 66" CMP culvert 420Iin.ft. 65.00 27,300 <br />Miscellaneous Lump Sum 5,000 <br /> Subtota I 122,900 <br />I Contingency, 20% 24,580 <br /> Total Field Cost 147,480 <br />I Use S150,000 <br />I Project Summary <br />I Land ,~"~ <br /> .,' <br /> Engineering Acquisition- /- <br /> \ I <br /> Channel Reach Field Cost Legal & Admin. (8000 S/Acre) Total <br />I S. Platte River to York St. 310,000 46,500 '--.c=-- 356,500 <br />I York St. to Explorador Calle 385,000 57,750 442,750 <br /> Explorador Calle to <br />I Washington Street 9,000 1,350 10,350 <br /> Culvert at N. Valley Shopping <br />I Center 305,000 45,750 350,750 <br /> Culvert North of E .84th Ave. 80,000 12,000 92,000 <br />I Channe I from E. 84th Ave. <br /> to In terstate 25 65,000 9,750 48,000 122,750 <br />I Tributary L Detention 23,000 7,500 16,000 46,500 <br />I Niver Creek Detention 435,000 65,250 256,000 756,250 <br /> Upstream of E. 88th Ave. 150,000 22,500 176,000 348,500 <br />I Total Project Cost = 2,526,350 <br />I <br />