Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE IY-2 (CONTINUED) <br />PAGE 3 OF 5 <br /> <br />Culvert North of East 84th Avenue <br /> <br />Item Quantity Un it Pri ce Cast <br />Excavation, trench in urban area 2,000 cu. yd. 3.00 6,000 <br />12' x 8' arch CMP culvert 400 !in. ft. 110.00 44,000 <br />Asphalt paving 15 tons 25.00 375 <br />18" riprap 300 tons 25.00 7,500 <br />Riprap bedding 40 cu.yd. 10.00 400 <br />Structural concrete 10 cu.yd. 125.00 1,250 <br />Miscellaneous Lump Sum 5,000 <br />Subtota I 64 , 525 <br />Contingency, 20"10 12,905 <br />Total Field Cost 77 ,430 <br /> Use S 80,000 <br /> <br />Channel from East 84th Avenue to Interstate 25 <br /> <br />Item Quantity Unit Price Cost <br />Excavation, open, rural 9,800 cu. yd. 1.00 9,800 <br />Compacted embankment 9,100 cu. yd. 2.00 18,200 <br />18" riprap 550 tons 25.00 13,750 <br />Riprap bedding 70 cu. yd. 10.00 700 <br />Seeding 5 acres 700.00 3,500 <br />86" x 138" arch CMP culvert 70 !in.ft. 110.00 7,700 <br />Subtotal 53,650 <br />Contingency, 20"/0 10,730 <br />Total Field Cost 64 , 380 <br /> Use S 65,000 <br />