Laserfiche WebLink
<br />I <br />I TABLE IV-2 <br /> PROJECT COST BREAKDOWN <br />I NIVER CREEK DRAINAGE STUDY <br />I South Platte River to York Street <br />I Item Quantity Unit Pri ce Cost <br />I Excavation 30,000 cu. yd. 1.00 30,000 <br />Compacted embankment 400 cu. yd. 2.00 800 <br />Grouted riprap 500 cu. yd. 40.00 20,000 <br />I 12" riprap 11 ,300 tons 10.00 113,000 <br />18" riprap 500 tons 25.00 12,500 <br />Riprap bedding 2,500 cu. yd. 10.00 25,000 <br />I Structural concrete 450 cu. yd. 125.00 56,250 <br />Subtota I 257,550 <br />I Contingency, 20% 52,000 <br />Total Field Cost 309,550 <br />I Use $310,000 <br />I York Street to Explorodor Colle <br /> Item Quantity Unit Price Cost <br />I Excavation 33,000 cu. yd. 1.00 33,000 <br /> Compacted embankment 4,600 cu. yd. 2.00 9,200 <br />I Grouted riprap 450 cu.yd. 40.00 18,000 <br />15" riprop 12,500 tons 15.00 187,500 <br /> 18" riprap 500 tons 25.00 12,500 <br />I Riprap bedding 2,500 cu. yd. 10.00 25,000 <br />Concrete paving 375 cu. yd. 75.00 28,125 <br /> Modify Explorador Colle <br />I Bridge opening Lump Sum 5,000 <br />Subtotal <br /> 318,325 <br />I Contingency, 2O"k 64,000 <br /> Total Field Cost 382,325 <br />I Use $385,000 <br />I <br />I <br />