My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02324
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:07 PM
Creation date
10/4/2006 10:48:43 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
32
County
Adams
Community
Federal Heights
Basin
South Platte
Title
Water and Drainage at Niver Creek, Phases 1 and 2: Cities of Federal Heights and Thornton, Colorado
Date
2/1/1974
Designation Date
6/1/1974
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />lined channel was not feasible due to excessive velocities (10 fps at 100-year <br />flood flows); therefore, riprap lining is recommended. <br /> <br />The estimated cost of modifying this reach to contain the 100-year flood <br /> <br />proved the scheme to be economical compared to the high damage potential. <br /> <br />Very little maintenance will be required in this reach except for cleaning <br /> <br />out debris which collects on the baffle blocks of the drop structure. <br /> <br />Explorador Calle Crossing <br /> <br />The existing bridge opening has a discharge capacity of 880 cfs which is <br />less than the 10-year flood flow of 1,250 cfs. Raising the bridge to increase dis- <br />charge capacity would be difficult and expensive. Examination of construction <br />drawings of the existing bridge indicated that the channel beneath the bridge could <br />be widened to increase the discharge capacity to 1,900 cfs. This would result in <br />sheet flow over the bridge during a 100-year flood; however, almost all of the <br />overflow wi II return to the channe I. <br /> <br />Explorador Calle to Washington Street - Plates 111-5 and 111-6 <br /> <br />Channel Design <br /> <br />The channel in this reach is contained in a corridor known as the Coronado <br />Parkway, bounded by Coronado Parkway on the north and East S3rd Drive on the <br />south. The existing chonnel is concrete lined for a height of 3.5 feet above the <br />channel invert. The channel drops approximately 28 feet in a length of 2,980 <br />feet or 9.5 percent. The existing channel shows no apparent sign of damage due <br />to the /lky 5, 1973 flood. <br /> <br />The land adjacent to the creek in this reach is fully developed with <br />single- and multi-family dwellings except for a 900-foot reach to the south of <br />the creek immediately east of Washington Street. <br /> <br />111-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.