My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02312
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:05 PM
Creation date
10/4/2006 10:47:58 PM
Metadata
Fields
Template:
Floodplain Documents
County
Fremont
Community
Canon City
Stream Name
Arkansas River
Basin
Arkansas
Title
Orchard Avenue Drainage Basin Planning Study
Date
11/1/1994
Prepared For
Canon City
Prepared By
Graef, Anhalt, Schloemer
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />This alternative differs with Alternate 2 in that all :[lows north of the Hydraulic Ditch will be <br />intercepted by a concrete open channel which would be constructed in the current canal location. <br />The existing canal flows would be enclosed within a 72" RCP. This concrete ch.mnel would vary <br />in size from 8 feet to 15 feet and transport this flow dircetly to the Abbey Channel. Tllis increase <br />in flow in the Abbey Channel would need to be dctained within a new detcntion basin within the <br />Abbey Channel. <br /> <br />Since all flows north of the existing Hydraulic Ditch would be intcrcepted, only the area south of <br />the canal would flow to SH 50. This flow could be intercepted by a 66" RCP stmm sewer and <br />transported to the Arkansas River. <br /> <br />The cost for this Alternate 3 is $4,695,000.00 <br /> <br />E. Alternate 4 <br />This alternative is also the same as Alternate 2 for the western draninage basin north of Pear <br />Street. Once the flow reachcs Pear Street from tlle western and central portion of the drainage <br />basin, a 60" RCP storm sewer will transport flows to Diamond A vcnue. For the central basin the <br />proposed storm sewer along Central Avenue will continue west past Stage Coach A venue and then <br />turn south through an easement witl1in an undevdoped area until it reaches a jum;don box at Pear <br />Street. From Pear Street south to SH 50 a 72" RCP stonn sewer would be built to intercept about <br />60% of the flow. The remainder of the lOO-year flow would be contained within improved street <br />sections down Orchard Avenue, Diamond Avenue and Cottonwood Avenue to SH 50. The total <br />lOO-year flow would be intercepted by a 10 x 5 foot box culvert and transported to Ihe Arkansas <br />rivcr. <br /> <br />The flow from the eastern portion of the basin would continue flowing toward the Abbey Drainage <br />Basin. <br /> <br />The estimated cost for Alternate 4 is $2,918,000.00. <br /> <br />F. Alternate 5 <br />The improvements in this alternative are the same as those outlined in Alternate :3 eKcept that the <br />flow would be intereepted by a system along Central A venue instead of the Hydraulic Ditch. The <br />ncw Central Avenue trunk sewer would begin as a 60" RCP and increase in size to a 12 x :; foot <br />box culvert when it outfalls into the Abbey Channel. <br /> <br />The cost for this Alternate 5 is $3,281,000.00. <br /> <br />G. Summary of Alternatives <br />Several factors were used to evaluate the alternatives, these included: Cost, constructability, <br />citizen feedback, and city input. As a result of tlle numerous meetings held with public and <br />private individuals Alternate 4 was selected as the preferred alternative. It was .11:;0 recommendcd <br />that Alternate 4 be modified to include the 16 acre - iCet detention basin along Field Drive to <br />reduce flows into the Abbey Channel. <br /> <br />Alternate 4 will require the disruption to only one residential street for construction. It also <br />erosses SH 50 and the railroad in one location. A further reason for choosing this alternative is <br />that the Fremont County Sanitary District can coordinate the construction of a new trunk sewer <br />such that the new sanitary laterals would be placed. below the proposed 72" RCP :>Ioml sewer <br />invert. <br />
The URL can be used to link to this page
Your browser does not support the video tag.