My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02245
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:23:53 PM
Creation date
10/4/2006 10:43:41 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
522
County
Grand
Community
Grand Lake
Basin
Colorado Mainstem
Title
Floodplain Information Report - Grand Lake
Date
1/1/1986
Designation Date
7/1/2000
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />INTRODUCTION <br /> <br />Purpose and Scope <br />This Floodplain Information Report was prepared to provide supporting documentation for the <br />approximate loo-year floodplain boundaries shown on the Town of Grand Lake FIRM, dated <br />January 1, 1986. The FIRM was prepared using approximate floodplain mapping techniques. <br />Engineering information was not provided by FEMA to support the approximate floodplain <br />delineations Little Columbine Creek and Tonahutu Creek shown on the FIRM. This FIR provides <br />limited engineering information to fulfill that need. <br /> <br />This FIR includes: <br /> <br />1. Authorization for the report and its purpose and scope; <br /> <br />2. Study area description including information on the community, the watershed, any known <br />flooding history/flooding problems, previous studies and projects, and community response to <br />the CWCB designation and approval process; <br /> <br />3. Description of hydrologic and hydraulic information; and <br /> <br />4. Floodplain management program. <br /> <br />Authorization <br />The CWCB has certain statutory responsibilities relating to the designation and approval of <br />floodwater runoff channels or basins as follows: <br /> <br />... "to devise and formulate methods, means, and plans for bringing about the greater <br />utilization of the waters of the state and the prevention of flood damages therefrom, and to <br />designate and approve storm or floodwater runoff channels or basins, and to make such <br />designations available to legislative bodies of cities and incorporated Towns, to Town <br />planning commissions, and to boards of adjustment of cities, incorporated Towns, and <br />counties of this state"..., Section 37-60-106(1)(c) of the Colorado Revised Statues (CRS). <br /> <br />A CWCB designation and approval of current floodplain information is needed for the incorporated <br />areas of Town of Grand Lake, Colorado. The CWCB has prepared this FIR as a means of <br />designating Town of Grand Lake's FIRM so that the community can better implement its <br />floodplain management program. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.