My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02242
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:23:52 PM
Creation date
10/4/2006 10:43:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Basin
Gunnison
Title
Uncompahgre Valley Reclamation Project - Hydropower - Part 1 - Final Environmental Impact Statement
Date
8/28/1990
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Ii <br /> <br />SUMMARY <br /> <br />.-' <br />Water for the powerplant would be diverted from the Gunnison <br />River using a priority system for allocating flows for needs <br />including irrigation, instream flow, and power pr.oduction. <br />Senior irrigation demands and instream flow ag~eements would be <br />given priority over hydropower needs. Mean annual diversions <br />from the Gunnison River would be 691,013 acre-feet. A minimum <br />instream flow level of 300 ft'/s .would be met in the Gunnison <br />River, except in dry years when water is needed to satisfy senior <br />irrigation rights, as in existing operations. <br /> <br />Environmental co~itme~ts under alternative B include protection <br />of instream flows and irrigation supplies, acquisition and <br />development of lands for wetland replacement, acquisition of <br />lands to preserve an endangered plant species, development of <br />deer escapes in the enlarged AB Lateral, protection and <br />monitoring of riverbanks along the Uncompahgre River downstream <br />from the powerplant, monitoring of the endangered bald eagle, and <br />restoration of areas disturbed during construction. <br /> <br />ALTERNATIVE C <br /> <br />Alternative C, like alternative B, would divert water from the <br />South Canal and AB Lateral into a penstock that would convey <br />water to the powerplant near Montrose. To increase water <br />supplies for hydropower production, alternative C includes <br />enlarging the Tunnel from its present capacity of 1,135 ft'/s to <br />1,300 ft'/s. However, the penstock and turbine capacity would <br />still be limited to 1,135 ft'/s. Mean annual diversions from the <br />Gunnison River would be 726,896 acre-feet. Other features and <br />operational and environmental considerations are similar to <br />alternative B. <br /> <br />ReC6.""~,,,jeJ <br />ALTERNATIVE E <br /> <br />The physical features of alternative E are similar to <br />alternative B. The penstock and powerplant would be designed to <br />a maximum capacity of 950 ft'/s, rather than 1,135 ft'/s. The <br />penstock and enlarged AB Lateral would be scaled down from <br />alternative B. The plan would include the bypass of flUShing <br />flows in the Gunnison River to reduce siltation, and it would <br />deliver additional water to the Uncompahgre River upstream from <br />Montrose during the summer. ~ean annual diversions from the <br />Gunnison River would be 661,090 acre-feet. Other features and <br />operational and environmental considerations are similar to <br />alternative B. Alternative E is Reclamation's recommended plan. <br /> <br />IflCr<l.O-Be-c1 () p<Ll'etm6 ".-~; j:2"f,i',7v1' h V o,-H:;J' (;'.c':\nl':.' <br /> <br />f>r o.bo,;{ :-:;" y~f5': '7/ <br /> <br />/'r,.;;...1_'. <br /> <br />~ : ~,'. ~ f-~ <br /> <br />S - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.