Laserfiche WebLink
<br />TABLE OF CONTENTS (Continued) <br /> <br />FIGURES <br /> <br />Page <br /> <br />Frontispiece Map <br /> <br />SUMMARY <br /> <br />S-l Schematic of AB Lateral Project (looking south <br /> towards San Juan Mountains) . . . . S-2 <br />S-2 Summer operation of AB Lateral Project <br /> (looking south) . . . 8-3 <br />S-3 winter operation of AB Lateral Projeet <br /> (looking south) . S-4 <br /> <br />CHAPTER 1 <br /> <br />PURPOSE AND NEED <br /> <br />1.1 Uncompahgre Valley Reclamation Project <br />1.2 Gunnison River Basin. . . . . . . . . <br /> <br />8 <br />10 <br /> <br />CHAPTER 2 <br /> <br />ALTERNATIVES INCLUDING PROPOSED ACTION <br /> <br />2.1 <br />2.2 <br />2.3 <br /> <br />2.4 <br />2.5 <br />2.6 <br /> <br />2.7 <br />2.8a <br /> <br />2.8b <br /> <br />2.9 <br /> <br />Location of project features .. . <br />Proposed modification to AB Lateral <br />Selected and alternative penstock <br />alignments . . . <br />Plan of powerhouse site . <br />Tailrace details . <br />Proposed location of transmission <br />line <br />Bank stabilization plan and details <br />Proposed bank stabilization locations for the <br />Uncompahgre River between Delta and Olathe <br />(AB Lateral Project; 36 planned sites) <br />Proposed bank stabilization locations for the <br />Uncompahgre River between Olathe and Montrose <br />(AB Lateral project; 30 planned sites) <br />Location of Alternative G (South Canal sites) <br /> <br />25 <br />27 <br />29 <br />31 <br />32 <br />33 <br />37 <br /> <br />40 <br /> <br />41 <br />64 <br /> <br />CHAPTER 3 <br /> <br />AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES <br /> <br />3.1 <br /> <br />3.2 <br />3.3 <br /> <br />General area map, Uncompahgre Reclamation <br /> <br />Project . . . . . . . . . . . . . <br />Gunnison Gorge area . . . . . . . . . . . <br />Flow duration curve of historic flow data <br />(Gunnison River below Gunnison Tunnel <br />for the period 1903 through 1988) <br /> <br />78 <br />79 <br /> <br />85 <br /> <br />xiii <br />