Laserfiche WebLink
<br />TABLE OF CONTENTS--Continued <br /> <br />Page <br /> <br />Alternative E . . . . . . . <br />Alternative F . . . . . . . <br />Detailed description of alternatives <br />Alternative A (no action) <br />Alternative B ..... <br />Features of Alternative B <br />Canal modifications <br />Penstock . . . . . . <br />Powerhouse . . . . . <br />Stilling basin and tailrace <br />Transmission line <br />Bank stabilization . . . . <br />Access to facilities . . . . <br />Safety features incorporated into facility <br />design ..... <br />Rights-of-way <br />Costs and financing <br />Alternative C <br />Features of Alternative C <br />Alternative E ..... <br />Features of Alternative E <br />Canal modifications <br />Penstock <br />Powerhouse . . . . <br />Alternative F .... <br />Water supply and operation of development <br />alternatives ....... <br />Water supply allocation <br />Control systems for facility and <br />water supply operations . . . . <br />Specific water supply considerations <br />Alternative A <br />Alternative B <br />Alternative C <br />Alternative E <br />Alternative F <br />Specific considerations for operation <br />of the project . . . . . <br />Environmental commitments and measures <br />Environmental commitments and measures common <br />to all alternatives <br />Gunnison River <br />Uncompahgre River <br />Affected lands <br />Affected wildlife <br />Pollution control and aesthetics <br />Endangered species ...... <br />Specific environmental commitments and measures <br />Alternative B <br />Alternative C <br /> <br />20 <br />20 <br />21 <br />21 <br />24 <br />24 <br />24 <br />26 <br />28 <br />30 <br />30 <br />30 <br />43 <br /> <br />43 <br />44 <br />44 <br />45 <br />45 <br />46 <br />46 <br />47 <br />47 <br />47 <br />48 <br /> <br />48 <br />48 <br /> <br />49 <br />50 <br />51 <br />51 <br />51 <br />51 <br />51 <br /> <br />51 <br />56 <br /> <br />56 <br />56 <br />57 <br />58 <br />58 <br />59 <br />59 <br />60 <br />60 <br />60 <br /> <br />ii <br />