Laserfiche WebLink
<br />1 The minimum flow for alternative F would be increased as necessary d.uring winter months for elill1nating ice buildup 1n the <br />Gunnison River downstream of the TUnnel. <br />2 Penstock diameters are preliminary and. subject to change. <br />