My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02223
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:23:48 PM
Creation date
10/4/2006 10:42:22 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Littleton
Stream Name
Upper Slaughterhouse Gulch
Basin
South Platte
Title
Major Drainageway Planning
Date
3/1/1983
Prepared For
Littleton, Arapahoe County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />The evaluation of the Powers Park detention pond and spillway was made by <br />establishing a stage/discharge relationship for the spillway from the as-constructed <br />drawings. The area/capacity relationship was determined by integrating the areas <br />from the 2-foot contour interval maps and from construction drawings, <br /> <br />I <br /> <br />CHAPTER IV - HYDRAULIC ANALYSIS <br /> <br />I <br /> <br />A. General <br /> <br />I <br /> <br />I <br /> <br />The purpose of the hydraulic analysis in a major drainageway planning study <br /> <br />is to define the floodplains for the various frequency storms and evaluate the <br /> <br /> <br />adequacy of the existing drainage facilities, such that the damage potential and <br /> <br />viable alternatives can be defined and evaluated, The methodology used and the <br /> <br /> <br />results of the analysis are presented in this chapter. The floodplains were defined <br /> <br /> <br />for the 2-, 5-, 10-, 50-, and lOa-year flood flows for the future basin develop- <br /> <br />ment condition, The evaluation of the existing drainage facilities is limited to <br /> <br /> <br />determining the capacity and general condition and does not include evaluating <br /> <br />the structural integrity of the facility. <br /> <br />C. Floodplain Determination <br /> <br />I <br /> <br />I <br /> <br />B, Evaluation of ExistinR Drainage Facilities <br /> <br />The floodplain for the study area was determined using a computerized backwater <br /> <br /> <br />program, The program is titled "HEC-2 Water Surface Profiles", The required input <br /> <br /> <br />to the program is the channel cross-section coordinates, the hydraulic properties <br /> <br /> <br />of each sub-section within the cross-section, and the discharge value, The back- <br /> <br />water calculations are initiated by inputting a known water surface elevation and <br /> <br /> <br />discharge value. The longitudinal spacing of the cross-sections varies with channel <br /> <br /> <br />condition, but generally the spacing was less than 200-feet. The starting water <br /> <br />surface elevation was obtained from the results of the SWMM model output at Powers <br /> <br /> <br />Park, At each of the initializing sections, another section was considered immedi- <br /> <br /> <br />ately upstream to stabilize the backwater calculations, Discharge and corresponding <br /> <br />water surface elevations for the future development condition 2-, 5-, 10-, 50-, and <br /> <br /> <br />lOa-year flood and for.the existing development condition loa-year flood were input <br /> <br />and backwater profiles calculated. These data were then plotted on the 2-foot <br /> <br /> <br />contour interval project mapping and the corresponding floodplains was outlined, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />The evaluation of the existing drainage facilities was performed using the <br />I" = 100', 2-foot contour interval mapping prepared by Landmark Mapping Company <br />under a separate contract with Urban Drainage and Flood Control District (UD&FCD) <br />and field survey and documentation provided by the City of Littleton, The <br />facilities that were evaluated included channels, storm sewers, and detention <br />ponds and spillways, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />The capacity of the storm sewer systems was determined using the guidelines <br />presented in the Urban Storm Drainage Criteria Manual (Reference-5), The capacity <br />of the system was estimated by evaluating the pipe and the inlets to determine which <br />facility controls (limits) the capacity, The full flow capacity of the pipe was <br />calculated using the "minilllUm" pipe slope and approximate roughness coefficient. <br />The capacity of the inlets was calculated based upon the type (i,e" grate, curb <br />opening, or combination) and whether the inlet was lion-grade II or in a "sump" COn- <br />dition, then applying the suggested "allowable capacity" reduction factor (Reference- <br />5). <br /> <br />D, Evaluation of Proposed Drainage Facilities <br /> <br />I <br /> <br />I <br /> <br />Capacities of all proposed storm sewer pipes were determined using the guid- <br /> <br />lines presented in the Urban Storm Drainage Criteria Manual (Reference-S), The <br /> <br /> <br />evaluation of the proposed Caley detention pond facility was made by establishing <br /> <br /> <br />a stage/discharge relationship for the spillway and outlet works, The area/capacity <br /> <br /> <br />relationship of the detention reservoir was determined by integrating the areas <br /> <br /> <br />from the 2-foot contour interval maps, The affects of the proposed detention <br /> <br /> <br />facility were evaluated by re-running the SWMM program with the proposed detention <br /> <br /> <br />pond in place. The results are presented on the peak flow diagram in Figure 111-6, <br /> <br /> <br />From these peak flows the capacities of the proposed storm sewers were subtracted <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />-23- <br /> <br />-24- <br />
The URL can be used to link to this page
Your browser does not support the video tag.