My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02174
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:23:38 PM
Creation date
10/4/2006 10:41:02 PM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Community
Lakewood
Stream Name
Dry Gulch
Basin
South Platte
Title
Major Drainageway Planning
Date
7/1/1979
Prepared For
Denver
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />Description of Proposed Improvements: <br /> <br />Sheet l7 <br /> <br />Estimated Cost of Proposed Improvements: Sheet 17 (Reaches G & H Combined) <br /> <br />I <br /> <br />Item Description <br /> <br />Quantity <br /> <br />Unit <br /> <br />Unit Price <br /> <br />Cost <br /> <br />flow would continue to occur in larger floods. <br /> <br />In order to <br /> <br />CONSTRUCTION <br />78" Stonn Sewer <br />90" Storm Sewer <br />96" Storm Sewer <br />Asphalt over 78" Pipe <br />Asphalt over 90" Pipe <br />Asphal t over 96" Pipe <br />Manholes <br /> <br />I <br /> <br />The proposed improvement in the North Dry Gulch channel is a <br /> <br />continuation of the storm sewer system. <br /> <br />pipes, and manholes. <br /> <br />New right-of-way would be required in the <br /> <br />Construction Sub-total <br />15% Engineering <br />10% Contingencies <br />Total Construction <br /> <br />1,390 L.F. $200 $278,000 <br />660 L.F. 270 178,200 <br />350 L.F. 300 105,000 <br />1,390 L.F. 25 35,750 <br />660 L.F. 26 17,l60 <br />200 L.F. 27 5,400 <br />6 Ea. 1,000 6,000 <br />45 Ea. 1,000 45,000 <br />1,510 L.P. 30 45,300 <br />1,510 L.F. 18 27,180 <br /> $741,990 <br /> 111,299 <br /> 74,199 <br /> $927,488 <br /> <br />I <br /> <br />This system is designed <br /> <br />to convey the ten-year flood underground; therefore, a surface <br /> <br />minimize disruption of traffic on Colfax Avenue, it is proposed <br /> <br />I <br /> <br />that the pipe be constructed in the parking lot north of the <br /> <br />I <br /> <br />street between stations 828+50 and 835+l2. <br /> <br />Inlets <br />Inlet Pipe <br />Asphalt over Inlet Pipe <br /> <br />I <br /> <br />Several small basins are tributary to the main North Dry Gulch <br /> <br />I <br /> <br />I <br /> <br />channel at Pierce Street, necessitating numerous inlets, inlet <br /> <br />parking lot north of Colfax, and between buildings east of <br /> <br />LAND ACQUISITION <br />Right-of-way Acquisition <br />Easements along Pipe Lines <br /> <br />I <br /> <br />Newland Street. <br /> <br />.17 <br /> <br />A <br /> <br />45,000 <br /> <br />5% Legal <br />Total Land Acquisition <br /> <br /> 7,650 <br /> 15,000 <br />$ 22,650 <br /> 2,265 <br /> 1,133 <br />$ 26,048 <br />$953,536 <br /> <br />I <br /> <br />1,000 <br /> <br />L.F. <br /> <br />15 <br /> <br />Land Acquisition Sub-total <br />10% Contingencies <br /> <br />I <br /> <br />I <br /> <br />TOTAL COST <br /> <br />Reach H <br /> <br />Total Const. <br />$ 596,125 <br />$ 331,363 <br /> <br />Land Acquisition <br /> <br />Total <br /> <br />I <br /> <br />'~ <br /> <br />Sheet 17 Costs in Each Reach <br />Reach G <br /> <br />$ 26,048 <br />o <br /> <br />$622,173 <br />$331, 363 <br /> <br />I <br /> <br />, '~ '.'" ~ <br />~t <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.