Laserfiche WebLink
<br />Description of Proposed Improvements: Sheet 7 <br /> <br />Estimated Cost of Proposed Improvements: <br /> <br />A storm sewer system is planned between Garland and Garrison <br /> <br /> <br />Streets which will convey the 10-year flood. A portion of this <br /> <br /> <br />flow will be carried in the existing system, which will join <br /> <br /> <br />with the new pipe east of Garrison. A portion of the lOO-year <br /> <br /> <br />flow will continue to be carried on the surface to the inter- <br /> <br /> <br />section. The surface flow will diverge at this point. Part of <br /> <br /> <br />the flow will proceed eastward on the north side of Colfax and <br /> <br /> <br />enter the North Dry Gulch sub-basin. This situation occurs to <br /> <br /> <br />a greater degree at present. <br /> <br />Item Description <br /> <br />Quantity <br /> <br />CONSTRUCTION <br /> <br /> <br />9011 Storm Sewer <br /> <br />Twin SiX? Box Culverts <br /> <br /> <br />5'x81 Box Culvert <br /> <br /> <br />Asphalt over Twin SiX?' Box <br /> <br /> <br />Asphalt over 5'x8' Box <br /> <br /> <br />Manholes <br /> <br />Inlets <br /> <br /> <br />Inlet Pipe <br /> <br /> <br />Asphalt over Inlet Pipe <br /> <br /> <br />Curb and Gutter Replacement <br /> <br /> <br />Inlet Apron <br /> <br /> <br />Outlet Headwall <br /> <br /> <br />Overflow Spillway from Ditch <br /> <br /> <br />Excavation for Open Channel <br /> <br /> <br />Concrete Low Flow Channel <br /> <br /> <br />Maintenance Roadway <br /> <br /> <br />Drop Structure <br /> <br /> <br />Construction Sub-total <br />1511 Engineering <br />10% Contingencies <br />Tbtal Construction <br /> <br />50 <br />270 <br />770 <br />220 <br />770 <br />4 <br />12 <br />370 <br />370 <br />195 <br />1 <br />1 <br />1 <br />5,400 <br />100 <br />580 <br />2 <br /> <br />From Garrison St. to Estes St. a series of lined channels, <br /> <br /> <br />bridges and culverts have been either planned or constructed by <br /> <br /> <br />individual developers. These facilities in general convey at <br /> <br /> <br />least a lO-year flood and protect the buildings from damage ln <br /> <br /> <br />a lOO-year flood. Maintenance access is provided either by <br /> <br /> <br />roadways or permission to use parking lots. <br /> <br />New twin 5'x7' box culverts are proposed under Estes St. and l4th <br /> <br /> <br />Avenue, parallel to the existing 3.2'xlO' box culvert. An over- <br /> <br /> <br />flow structure exists at station l82+50 to discharge storm flows <br /> <br /> <br />carried by the Rocky Mountain Ditch into the Dry Gulch channel. <br /> <br /> <br />Downstream from l4th Avenue an open channel with 4:l sideslopes, <br /> <br /> <br />a concrete low-flow channel and erosion control structures is <br /> <br /> <br />proposed. The channel would be constructed to keep flow veloci- <br /> <br /> <br />ties below 7.5 feet per second in a lO-year flood. The channel <br /> <br /> <br />will connect with a downstream detention pond and provides an <br /> <br /> <br />opportunity for a greenbelt or park environment if additional <br /> <br /> <br />right-of-way is acquired. <br /> <br />LAND ACQUISITION <br />Right-of-way Acquisition <br />Easements along Pipelines <br /> <br />Land Acquisition Sub-total <br />10% Contingencies <br />5% Legal <br />Total Land Acquisition <br /> <br />TOTAL COST <br />Sheet 7 Costs in Each Reach <br />Reach D <br />Reach E <br /> <br />1.5 <br />790 <br /> <br />Total Canst. <br />$ 244,162 <br />$392,638 <br /> <br />Sheet 7 (Reaches D & E) <br /> <br />Unit <br /> <br />L.F. <br /> <br /> <br />L.F. <br /> <br /> <br />L.F. <br /> <br /> <br />L.F. <br /> <br />L.F. <br /> <br /> <br />Ea. <br /> <br /> <br />Ea. <br /> <br /> <br />L.F. <br /> <br /> <br />L.F. <br /> <br /> <br />L.F. <br /> <br /> <br />L.S. <br /> <br /> <br />L.S. <br /> <br />L.S. <br /> <br /> <br />C.Y. <br /> <br />C.Y. <br /> <br /> <br />L.P. <br /> <br /> <br />Ea. <br /> <br />Unit Price <br /> <br />$ 270 <br />425 <br />325 <br />46 <br />27 <br />1,000 <br />1,000 <br />30 <br />18 <br />10 <br />3,000 <br />3,000 <br />3,000 <br />3 <br />210 <br />14 <br />5,000 <br /> <br />A 25,000 <br />L.F. 15 <br /> <br />Land Acquisition <br />$ 44,505 <br />$ 12,248 <br /> <br />Cost <br /> <br />$ 13,500 <br />114,750 <br />250,250 <br />10,120 <br />20,790 <br />4,000 <br />12,000 <br />11,100 <br />6,660 <br />1,950 <br />3,000 <br />3,000 <br />3,000 <br />16,200 <br />21,000 <br />8,120 <br />10,000 <br /> <br />$ 509,440 <br />76,416 <br />50,944 <br />$ 636,800 <br /> <br />37,500 <br />11,850 <br />$ 49,350 <br />4,935 <br />2,468 <br />$ 56,753 <br />$693,553 <br />Total <br />$ 288. 667 <br />$ 404,886 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />