<br />Estimated Cost of Proposed Improvements: Sheet 5 (Reaches E & F Combined)
<br />
<br />Description of Proposed Improvements: Sheet 5
<br />
<br />Item Description
<br />
<br />Quantity
<br />
<br />The intersection of l4th Place and Miller Street lies in a low
<br />
<br />
<br />area subject to extensive flooding. Under present conditions
<br />
<br />
<br />a deep pond would occur in a lOO-year storm which would even-
<br />
<br />
<br />tually become deep enough to spill northward over Colfax Avenue.
<br />
<br />
<br />The 54-inch pipe entering the low area is sized to convey the
<br />
<br />
<br />ten-year flow, the 18-inch pipe under Colfax is sized to convey
<br />
<br />
<br />the lOO-year flow, in order to reduce the size and depth of the
<br />
<br />
<br />ponding area. Between Colfax Avenue and l5th Place, numerous
<br />
<br />
<br />inlets are recommended to collect the flow discharged from the
<br />
<br />
<br />Westland Shopping Center. The lO-year flow cannot be collected
<br />
<br />
<br />entirely by the designated inlets, so future laterals are re-
<br />
<br />
<br />quired to collect the flow. Laterals are recommended extending
<br />
<br />
<br />west on the north side of Colfax Avenue, west into the Westland
<br />
<br />
<br />parking lot from the intersection of 15th Place and Miller
<br />
<br />
<br />Street, and north on Miller Street from 15th Place.
<br />
<br />CONSTRUCTION
<br />54" Storm Sewer
<br />78" Storm Sewer
<br />108" Storm Sewer
<br />10' x 61 Box
<br />Asphalt over 54" Pipe
<br />Asphalt over 78" Pipe
<br />Asphalt over 108" Pipe
<br />Asphalt over 10' x 6' Box
<br />Manholes
<br />Inlets
<br />Inlet Pipe
<br />Asphalt over Inlet Pipe
<br />Curb and Gutter Replacement
<br />Outlet Headwall
<br />Open Channel Excavation
<br />Slope Protection
<br />Slope Protection Filter
<br />Low Flow Channel
<br />
<br />Construction Sub-total
<br />15% Engineering
<br />10% Contingencies
<br />Total Construction
<br />
<br />LAND ACQUISITION
<br />Right-of-way Acquisition
<br />Easements along Pipe Lines
<br />
<br />Land Acquisition Sub-total
<br />10% Contingencies
<br />5% Legal
<br />Total Land Acquisition
<br />
<br />'KlTAL COST
<br />
<br />Sheet 5 Costs in Each Reach
<br />Reach E
<br />Reach F
<br />
<br />Total Const.
<br />$ 389,962
<br />$ 393,875
<br />
<br />480
<br />550
<br />625
<br />55
<br />30
<br />450
<br />290
<br />55
<br />6
<br />26
<br />630
<br />630
<br />390
<br />1
<br />10,500
<br />3,200
<br />800
<br />105
<br />
<br />An open channel is proposed along the alignment of an existing
<br />
<br />
<br />channel south of l5th Place. The channel bottom must be lowered
<br />
<br />
<br />to conform to required pipe elevations at each end. Terraced
<br />
<br />
<br />gab ion or concrete lined sideslopes are recommended because of
<br />
<br />
<br />the channel depth and to avoid excessive right-of-way acquisi-
<br />
<br />
<br />tion. Maintenance access is possible from the adjacent street.
<br />
<br />
<br />Flow velocities in the lO-year and lOO-year floods would not be
<br />
<br />
<br />excessive, because of the backwater created by the proposed
<br />
<br />
<br />culvert under Kipling Street.
<br />
<br />1.21
<br />1,540
<br />
<br />Unit
<br />
<br />Unit Price
<br />
<br />L.F. $ 85
<br />L.F. 200
<br />L.F. 360
<br />L.F. 380
<br />L.P. 22
<br />L.F. 25
<br />L.F. 28
<br />L.F. 30
<br />Ea. 1,000
<br />Ea. 1,000
<br />L.F. 30
<br />L.F. 18
<br />L.F. 10
<br />L.S. 5,000
<br />C.Y. 3
<br />C.Y. 22
<br />C. Y. 17
<br />C.Y. 210
<br />
<br />A 25,000
<br />L.F. 15
<br />
<br />Land Acquisition
<br />$ 41,5l5
<br />$ 19,837
<br />
<br />$ 40,800
<br />110,000
<br />225,00
<br />20,900
<br />660
<br />11,250
<br />8,120
<br />1,650
<br />6,000
<br />26,000
<br />18,900
<br />11,340
<br />3,900
<br />5,000
<br />31,500
<br />70,400
<br />13,800
<br />22,050
<br />
<br />$627,070
<br />94,060
<br />62,707
<br />$783.837
<br />
<br />30,250
<br />23,100
<br />
<br />$ 53,350
<br />5,335
<br />2,667
<br />$ 61,352
<br />
<br />$845,189
<br />
<br />Total
<br />$431,477
<br />$413,712
<br />
|