Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Description of Proposed Improvements: Sheet 3 <br /> <br />Estimated Cost of Proposed Improvements: <br /> <br />Sheet 3 (Reach F) <br /> <br />The 100-year flood plain illustrated is expansive, but very <br /> <br /> <br />shallow. The flow rates in even the lOO-year flood are small <br /> <br /> <br />enough that they could be conveyed easily in a small storm sewer <br /> <br /> <br />system or a surface channel. Since the property will likely be <br /> <br /> <br />developed for commercial use, it is recommended that no major <br /> <br /> <br />drainage system is necessary. The future developer will be re- <br /> <br /> <br />quired to adequately drain his property toward Quail Street. <br /> <br />Item Description <br /> <br />CONSTRUCTION <br />Overflow Spillway at Ditch <br />Graded Earthen Swale <br /> <br />Construction Sub-total <br />15% Engineering <br />10% Contingencies <br />Total Construction <br /> <br />Quantity Unit Unit Price Cost <br />1 L.S. $ 5,000 $ 5,000 <br />530 C.Y. 3 1,590 <br /> 6,590 <br /> %9 <br /> 659 <br /> $ 8,238 <br /> <br />The only required improvement is a spillway on the Agricultural <br /> <br /> <br />Ditch which will discharge excess storm flows into the Dry Gulch <br /> <br /> <br />basin rather than allowing the ditch to convey them out of the <br /> <br /> <br />basin. For this purpose, a graded channel is proposed to con- <br /> <br /> <br />nect the spillway to Quail Street. A permanent right-of-way for <br /> <br /> <br />the channel is required, although it is conceivable that a future <br /> <br /> <br />developer may elect to place the channel flow in an underground <br /> <br /> <br />conduit. <br /> <br />LAND ACQUISITION <br /> <br /> <br />Right-of-way Acquisition <br /> <br /> <br />10% Contingencies <br /> <br /> <br />5% Legal <br /> <br />Total Land Acquisition <br /> <br /> <br />TOTAL COST <br /> <br />0.67 <br /> <br />A <br /> <br />35,000 <br /> <br />23,450 <br />2,345 <br />1,172 <br />$26,967 <br /> <br />$35,205 <br />