Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1500 <br /> <br />1250 <br /> <br />1000 <br />0: <br />IIJ <br />> <br />o <br />o <br /> <br />00 <br />"- <br />o <br /> <br />z <br /> <br />IIJ <br />III <br />0: <br />4 <br />J: <br />o <br />00 <br />o <br />500 <br /> <br />250 <br /> <br />I- <br />00 <br /> <br /> <br />_\0- - <br /> <br /> <br />_5- <br /> <br />o <br /> <br /> <br /> J: <br /> !:: <br /> I- IIJ ~J: <br /> ;:) <br /> IIJ Z IIJO <br /> IIJ IIJ O..J <br /> 0: > z;:) <br /> I- 4 IIJIll <br /> 00 ;:) <br />l- I- IIJ X >- <br />IIJ <( "-0: <br />IIJ IIJ 0 "- ZO <br />0: IIJ 0: ..J 0 <br />I- 0: IIJ 0 0 <br />I- <br />00 00 Q. 0 _100- <br />~ IIJ ~ 100 <br />0: z -50 <br />0: <( 50 <br />4 <br />>- > <br /> <br />L _,0--\0 <br /> <br /> <br />5 <br />5 <br /> <br />\00 0 /' <br />.",0 50 <br />f:J0 <br />-- <br /> <br />10 <br /> <br />J.- <br /> <br />,,/ <br />!l- <br />-,./'" 5 <br /> <br />880+00 <br />STATIONING, IN <br /> <br />840.00 <br />FEET, ABOVE DRY GULCH <br /> <br />o <br />800+00 <br /> <br />PROJECTED PEAK DISCHARGES <br />ON <br />NORTH DRY GU LCH <br />BE FO REA N D AFT E R <br />CONSTRUCTION OF RECOMMENDED FACILITIES <br /> <br />FIGU RE m-2 <br /> <br />9 <br /> <br />1500 <br /> <br />The Master Plan for Development of the Dry Gulch and North Dry <br /> <br />Gulch channels affects these "existing" flows. The proposed <br /> <br />1250 <br />-100- PEAK FLOW RATE <br />AFTER CONSTRUC- <br />TION OF RECOM- <br />MENDED FACILlTIE <br /> <br />facilities provide greatly increased capacities, so the deten- <br /> <br />tion ponding and flow splits are reduced significantly. In <br /> <br />addition, a principal element of the Master Plan is a proposed <br /> <br />1000 <br /> <br />uIOO--PEAK FLOW RATE <br />AT PRESENT <br /> <br />detention storage pond on Dry Gulch west of Carr Street. This <br /> <br />pond serves to substantially reduce downstream flow rates. For <br /> <br />750 <br /> <br />these reasons, it was necessary to develop a complete set of <br /> <br />flow rates which would occur after construction of the proposed <br /> <br />improvements of the master plan. These flow rates are also <br /> <br />500 <br /> <br />illustrated in Figures III-l and III-2. In addition, typical <br /> <br />flood hydrographs for the Dry Gulch channel are shown in Figure <br /> <br />1II-3. <br /> <br />250 <br /> <br />Since the master plan in the majority of the basin recommends <br /> <br />construction of facilities to convey the lO-year flow, a surface <br /> <br />flow will continue to occur during floods which exceed the lO- <br /> <br />year flow. This surface flow will continue to be affected by <br /> <br />the flow splits and detention ponding which would occur under <br /> <br />present channel conditions. Presented below is a summary of the <br /> <br />principal changes in hydrology which are created by the proposed <br /> <br />improvements. The plans of proposed improvements which follow <br /> <br />in this report illustrate the lOO-year flooding limits which <br /> <br />would occur prior to and after construction of the facilities. <br /> <br />The flows to be conveyed by the proposed facilities and the <br />