My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02168
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:23:36 PM
Creation date
10/4/2006 10:40:43 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Basin
Gunnison
Title
Uncompahgre Valley Reclamation Project - Hydropower - Part 4 - Scoping Report Gunnison River Contract
Date
1/1/1990
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />than the proposed development of a contract, a decision could be made to abandon this effort <br />in favor or pursuing one of these alternatives. <br /> <br />. Meet Black Canyon needs by developing the Union PaJK Project and passing required <br />flows from its decree (200 cfs May I-September 30, 50 cfs October I-April 30) <br />. Protect endangered fish through Federal purchase or condemnation of water rights <br />. Augment supplies to help both endangered fish, provide lower basin growth needs, and <br />protect development of Colorado's Compact entitlement, by pumping groundwater into <br />the Gunnison Basin from the San Luis Valley for sale to lower basin customers <br />. Construct the Colorado Aqueduct Return Project (CARP) to develop and use Colorado's <br />Compact entitlement and provide water for endangered fish <br /> <br />Items 7 through 10 previously discussed some major factors to consider when articulating <br />"contract" alternatives. Other comments will also help us define alternatives. One suggestion <br />was to conduct studies to determine optimum flows for various environmental and economic <br />values, and then group values with "similar optimum flows" together (e.g. optimize flows for <br />endangered fish, riparian vegetation, campsite restoration, and sediment transport might be <br />grouped together to define one altemative). This respondent also thought selection of <br />alternatives should be "goal-driven." Others indicated that operational management targets <br />should be used (more stability, less fluctuation at Blue Mesa, higher target level in winter). <br />Some respondents also felt that alternatives should be described by including draft contract <br />language. <br /> <br />Suggestions relating to contract alternatives included: <br /> <br />. Leave as much water in the river as possible <br />. Provide fluctuating flows which exceed the 300 cfs instream water right <br />. Meet Black Canyon needs by using habitat improvements (such as channel improvements, <br />habitat modifications, and fish stocking) <br />. Provide for more stability and less fluctuation at Blue Mesa, including higher target level <br />in winter <br />. Develop a contract which addresses Black Canyon needs as well as the. need to preserve <br />historic benefits received by the Upper Gunnison Basin, including protection from <br />curtailment by downstream calls <br />. Restrict the quantity of water to be released under the Contract to an amount which <br />would provide significant protection to the Gunnison, yet allow AB Lateral Project to be <br />developed. Such an alternative might provide a 300 cfs minimum flow and set-up a <br />schedule to periodically flush the Gunnison bed (perhaps 2,000 cfs for 2weeks every 3 <br />to 5 years). Winter releases would need to be set at 1,250 cfs, and the discretion of the <br />NPS could be used to schedule other releases, subject to other rights. <br /> <br />Formulation of concise alternatives needs to involve many potentially affected parties. and the <br />scope of alternatives needs to be determined early. Alternatives must not conflict with <br />legislation or legislative intent for managing projects or reso~rces. Data collection and analysis <br /> <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.