Laserfiche WebLink
<br />BETA VERSION 3/15/95 <br /> <br />B-C Program: Infrastructure <br /> <br />Project Benefits <br />and Project Costs <br />Table <br /> <br />To Continue... <br /> <br />Print the Report <br /> <br />SUMMARY OF PROJECT BENEFITS AND COSTS <br /> <br /> <br /> <br />Exp.ct<ld Annual Damag.. B.fore Mitigation <br />Exp.ct<ld Annual Damlll.' Altor Mitigation <br />Exp.ct<ld Avold.d Damag.. Altor Mitigation (BENEFITS) <br /> <br />PROJECT BENEFITS <br />PROJECT COSTS <br />BENEFITS MINUS COSTS <br /> <br />BENEFIT..cOST RATIO <br /> <br />At this point, the mini-Benefit-Cost Analysis is complete. The Summary <br />section presents the Results. For a detailed explanation, please see the <br />Riverine Flood User's Guide Version 1.0, pages 9-12 to 9-14. <br /> <br />This completes the Riverine Flood Infrastructure Small Project <br />Benefit-Cost Program data entry process except for the Comments <br />section. All data sources, engineering judgements, and entries made for <br />the project under evaluation should be documented fully. Select <br />Comments from the Benefit-Cost Program menu. <br /> <br /> <br />COMMENTS <br /> <br />PINK Block (Information Only). Enter detailed information on the <br />source of engineering and flood data, cost estimates, and all other <br />pertinent information for the project under evaluation. <br /> <br />Click on PRINT in the Menu to print the two-page report. <br /> <br />6 <br />