My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02161
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:23:35 PM
Creation date
10/4/2006 10:40:38 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Statewide
Stream Name
All
Basin
Statewide
Title
Benefit-Cost Analysis of Hazard Mitigation Projects - Riverine Flood Infrastructure
Date
3/15/1995
Prepared For
FEMA
Prepared By
FEMA
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BETA VERSION 3/15/95 <br /> <br />B-C Program: Infrastructure <br /> <br />MITIGATION <br />PROJECT COST <br /> <br />Total Cost, <br />Including <br />Mitigation <br />Measure <br /> <br />Repair Cost, to <br />Pre-Disaster <br />Condition <br /> <br />Net Mitigation <br />Project Cost <br /> <br />PROJECT DATA <br /> <br /> <br />Mitigation Project Cost <br />Total cost. including mitigation m...ur. <br />R.p.lr cost, to p.....i..st.r condition only <br />N.t Mitigation P/'4j.ct Cost <br /> <br />Annual M.lnt.nanc. Cost ($Iy.'" <br />Pre.ent Value of Annu.1 Malnten.nce Cost ($) <br />TOTAL NET MITIGATION PROJECT COST <br /> <br />~$..~~t.~ <br /> <br />GREEN Block (Data Input). The total cost of the project includes the <br />cost of repair to pre-disaster condition (if applicable) and the cost of the <br />proposed mitigation measure. <br /> <br />GREEN Block (Data Input). The repair cost includes only the cost to <br />restore the damaged structure to its pre-disaster condition without <br />counting any proposed changes or upgrades. If the structure is <br />undamaged, enter 0; if there are no repair costs, enter O. <br /> <br />YELLOW Block (Result). The program calculates the Net Mitigation <br />Project Cost from the difference between the Total cost, including <br />mitigation measure and the Repair cost, to pre-disaster condition <br />only. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.