My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02122
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:23:25 PM
Creation date
10/4/2006 10:38:02 PM
Metadata
Fields
Template:
Floodplain Documents
County
Huerfano
Community
Walsenburg
Basin
Arkansas
Title
Engineering Feasibilty Study
Date
2/1/1997
Prepared For
Walsenburg
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. Meet with City officials and other public officials to obtain background information. <br /> <br />2. Collect available data and information required to perform the feasibility study. <br /> <br />3. Conduct field visits to perform physical site inspections, ground surveys, and to take <br />photographs of the area. <br /> <br />4. Perform engineering analyses which include hydrologic and hydraulic investigations <br /> <br />5. Study alternative solutions to the problem. <br /> <br />6. Prepare preliminary design drawings (plan sheet and typical cross-sections) and <br />construction cost estimates for the alternative mitigation plans. <br /> <br />7. Prepare a reconnaissance-level feasibility report that documents the results of the <br />study and provides a narrative of the alternative mitigation plans. <br /> <br />III. PREVIOUS FLOOD STUDIES <br /> <br />The list below summarizes in chronological order the previous studies, relevant to this <br />project, that were completed for the City of Walsenburg. The CWCB would like to thank <br />the EPICS project team from the Colorado School of Mines (CSM) for their effort in <br />preparing a drainage evaluation for the City of Walsenburg. The CSM project team <br />performed a significant amount of field investigations, research, engineering analyses, <br />and report preparation in support of this feasibility study. <br /> <br />I) U.S. Department of the Army, Corps of Engineers, Albuquerque District, Flood Plain <br />Information, Cucharas River and Tributaries, Walsenburg, Colorado, July 1977. <br /> <br />2) U.S. Department of Housing and Urban Development, Federal Insurance <br />Administration, Flood Hazard Boundary Map, City of Walsenburg, Colorado, <br />November 28, 1978. <br /> <br />3) U.S. Department of Housing and Urban Development, Federal Insurance <br />Administration, Flood Hazard Boundary Map, Huerfano County, Colorado, <br />November 22,1977. <br /> <br />4) Federal Emergency Management Agency, Flood Insurance Studv, City of <br />Walsenburg, Colorado, September 29,1986. <br /> <br />5) U.S. Department of Agriculture, Soil Conservation Service, William C. Wittwer, <br />Area Engineer, Engineering Trip Report, Holita Ditch, June 3,1991. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.