<br />VIII. CONSTRUCTION COST ESTIMATES <br /> <br />The Colorado Water Conservation Board estimated construction costs for the two <br />alternative mitigation plans. The cost estimates for alternatives I and 2 are presented in <br />Tables I and 2 for planning and feasibility evaluation purposes. The quantities, unit <br />costs, and engineering costs presented in Tables I and 2 are preliminary. The cost <br />estimates do not include potential costs for right-of-way acquisition, easements, and <br />utility relocations. The actual project cost will vary depending on the selected alternative, <br />the final project design quantities, contractor availability and costs, and materials <br />availability and costs. <br /> <br />IX. FINAL DESIGN <br /> <br />This report presents the results of the flood hazard mitigation study that was performed at <br />the request of the City of Walsenburg. Once a plan of improvement is chosen, the City of <br />Walsenburg will need to acquire the services of a consulting engineering firm should they <br />desire to proceed with the implementation of the plan. Final design drawings, <br />construction specifications, and a final cost estimate will need to be prepared for the <br />project prior to construction. <br /> <br />8 <br />