My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02110
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD02110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:43 PM
Creation date
10/4/2006 10:37:23 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Stream Name
Arkansas River
Title
Special Flood Hazard Information Report
Date
6/1/1974
Prepared For
Prowers County
Prepared By
US Army Corps of Engineers
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6 <br /> <br /> <br />Transmission facilities include a high-voltage transmission grid <br />to deliver power to the established delivery points in the market area, <br />to provide interconnections among the plants of the CRSP units and <br />participating projects, and to interconnect with other existing Federal <br />and utility systems within the market area. Additional transmission <br />facilities are planned to deliver power from the additional generation <br />mentioned above, to deliver to Northern Division customers the power <br />to be withdrawn from the Southern Division, and to meet improved <br />system reliability criteria. Map No. 594-400-79 is attached hereto <br />as Figure 1 to show the CRSP powerplants and transmission facilities, <br />as well as other principal power systems in the market area. <br /> <br />. <br /> <br />IV. HISTORY OF POWER RATES <br /> <br />The first CRSP power rate, the R4-Fl schedule, was established on <br />March 6, 1962. This rate was somewhat less than the prevailing power <br />rates in the market area and was sufficient, based on the then current <br />price level and the .then estimated future costs, to pay the project's <br />annual operating costs and provide the repayments and irrigation assist- <br />ance required. Following is that monthly rate schedule. <br /> <br />Energy 3 mills per kWh <br />Capacity $1.275 per kW, where the Kw is the greater <br />of the maximum 30-minute integrated demand or the <br />contract rate of delivery, such contract rate of <br />delivery being established for the Summer Season <br />(April through September) and/or for the Winter <br />Season (October through March). <br /> <br />Under the 1962 marketing criteria, sales to customers with no <br />supplemental supply were permitted by contract provisions to receive <br />their total energy requirements, regardless of load factor. Sales to <br />customers with supplemental supply were permitted up to 70 percent <br />seasonal load factor through March 1976. The average rate at 58.2 <br />percent load factor was 6 mills per kWh, with the charge being divided <br />equally between capacity and energy. <br /> <br />Repayment studies made each year after 1962 indicated no adjust- <br />ment was needed in the power rate until the fiscal year 1972 study was <br />made. The latter study indicated that project revenues at the then <br />existing rate would have resulted in repayment deficiencies within the <br />allowable repayment periods of the various features which are to be <br />repaid from power revenues. As a result of this situation, Reclamation <br />initiated rate adjustment procedures which culminated in the Department <br />of the Interior's November 1973 announced rate inc~ease. The new rate, <br />the UC-Fl schedule, which became effective April 1, 1974, increased the <br />monthly demand charge per kW from $1.275 to $1.32, based on the greater <br />of the maximum monthly demand or seasonal contract rate of delivery as <br />previously established, and leaving the energy charge at 3 mills per <br />kWh. The UC-Fl rate at 58.2 percent load factor was 6.11 mills per kWh, <br />
The URL can be used to link to this page
Your browser does not support the video tag.