Laserfiche WebLink
<br />7, Temporary fix. <br /> <br />. Opened Saturday March 18 (8 days), Closed on March 19 <br />to place steel plates on surface, reopened March 20. <br /> <br />. Twelve railroad flatbed cars 16,15 m (53 feet) lonfj, placed 3 <br />long and 4 wide on 4 bents of 6 I-beams driven into the <br />stream bed. <br /> <br />8. Investigation Team. <br /> <br />. Investigation by CAL TRANS, FHWA, USGS, CONSULTANTS <br /> <br />9. Lawsuit settled out of court, investigation discontinued, <br /> <br />C. Step 1A. Bridge Characteristics, <br /> <br />1. General <br /> <br />. Built in 1967 - 37.19 m (122 feet) long (27 -34-34-~? ft spans) <br /> <br />. Three cast in place column bents each bridge <br /> <br />. Deck elevation 471 feet <br /> <br />4,6 <br />