Laserfiche WebLink
<br />RECONNAISSANCElREVIEW REPORT FOR FLOODPLAIN MANAGEMENT <br />(FOR PROJECTS OVER $5,000 ONLY) <br /> <br />G::JCilili][E]CiliIiliJ[U <br />[JJ[]]~[RJ[]J[!]}]rn <br /> <br />APPLICANT (VIoltG ^ /ol U;tJ~) -ry <br />DSR NUMBER <br /> <br />rAc./I..I"'-Y <br /> <br />CATEGORY <br /> <br />1. Is the project in a Wetland (Swamp, marsh, etc.)? _ Yes X No <br /> <br />2. Is the project in one of the foilowing zones on a FIAlFEMA map? If it is . give map no, <br />() pl, 0 \ -z. 'l ()C!g{ c:.. If an FIAlFEMA map is unavailable. please estimate. <br /> <br />(CHECK ONLY ONE) <br />1 DO-year Floodplain <br /> <br />(1) <br />(2) <br />(3) <br /> <br />x <br /> <br />(4) <br />(5) <br /> <br />SOD-year Floodplain (CRITICAL ACTION) <br />Floodway <br />Coastal High Hazard Area <br />Check if project is outside floodplain but supports development in floodplain <br /> <br />IF PROJECT IS NEITHER IN NOR AFFECTS THE FLOODPLAIN OR WETLAND, <br />CHECK "NO" IN BLOCK SA OF THE DSR AND DO NOT FILL OUT THIS FORM. <br /> <br />3. Total DSR estimated cost of restoration. (Check one) <br /> <br />(1) <br />(2) <br />(3) <br /> <br />(4) <br /> <br />0-49% of replacement cost <br /> <br />50-99% of replacement cost <br /> <br />100% of replacement cost <br />Not applicable (Example - Debris Disposal) <br /> <br />4. Has this project been structurally damaged by flooding before? yes)( no. If yes, when <br />Has a flood insurance payment(s) ever been received? (BUILDINGS ONLY) <br /> <br />'( <br />_ yes -:....no <br /> <br />5. Mark type of land use upstream and downstream. <br /> <br />(a) PasturelCropland (Sparse Development) <br />(b) ForestJDesert (Undeveloped) <br />(c) Urban (Developed) <br />(d) Wetland (Marsh or Sloughs) <br /> <br />UPSTREAM <br />)( <br />X <br /> <br />It <br /> <br />DOWNSTREAM <br />X <br /> <br />6. Rer.omm..nd..tion (Check one) <br /> <br />1. Relocate outside base floodplain <br />2. Restore facility/structure with mitigation <br />3. Transfer function to another facility <br />4. Reduce scope of work or cost <br />5. Restore facility/structure without mitigation <br />6. No Action (Disapprove project) <br />7. More Information Required (Explain) <br /> <br />x <br />. <br /> <br />ES: For each recommendation except 5 and 6, complete and attach a Hazard Mitigation <br />Proposal showing the estimated work and costs. Submit signed reports with DSR. <br /> <br />Federal Inspector <br /> <br />Date <br /> <br />A <br /> <br />1. adll <br />2, glStrudure <br />3. Non-Emergency <br />4, Debris Disposal <br /> <br />~ <br /> <br />STEP 1 <br /> <br />U> <br />2 <br />3 <br />4 <br />5 <br /> <br />? <br /> <br />C <br />1 <br />2 <br />3 <br />4 <br /> <br />. <br /> <br />,0 <br /> <br />Declared Disaster/ <br />Insurance Payment? <br />1. Yes <br />cn:lO>, , <br />"'3:-oOn't know or NlA <br />