My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02020
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD02020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:57:59 PM
Creation date
10/4/2006 10:32:40 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Title
Feasibility Evaluation Multijurisdictional Urban Drainage Projects
Date
2/1/1977
Prepared For
UDFCD
Prepared By
Multiple Authors
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />45 <br /> <br />4. Structura 1 and Content Da tel - r.lobi 1 e lill' 'es <br />The,-e did not exist adequate publ ic cLll" "I, the value <br />of mobile homes and their contents. It \-Id'; !;pcessary to <br />contact a number of nel'l and used ",ohile home" sales <br />offices to obtain an avel'age per Ull it va I,,,, III each <br /> <br /> <br />mobile unit. <br /> <br /> <br />5. Removal of Debris and Cleaning - Publ ic Land <br /> <br /> <br />Estimates of the nUlliber of hours of dc,I'ris ,'emoval <br /> <br /> <br />necessary in public land uses such as streets and bridges <br /> <br /> <br />were made and the average per hour rate of tbe puhlic <br /> <br /> <br />employees who would b~ involved in the work multiplied <br /> <br /> <br />by 2.25 to cover overhead. This estimate is based uf'on <br /> <br /> <br />the personal experienc:e of the analyst (fonner lilUIi IC ipal <br /> <br /> <br />finance official). <br /> <br /> <br />6. Missed Work, Removal of Debris and Cleaniny - Residential <br /> <br /> <br />Land Uses <br /> <br /> <br />For each residential land use inundated. two days <br /> <br /> <br />per unit were estimated as necessary to do the cleaninq. <br /> <br /> <br />The two days were assumed equal to the daily pay of an <br /> <br /> <br />employee earning 512,000 per year. The per day rate <br /> <br /> <br />was based upon the 1970 census data on median income <br /> <br /> <br />adjusted to fit the specific characteristics of the homes <br /> <br /> <br />in the flood plain. This calculation also was designed <br /> <br /> <br />to cover lost income from missed work. <br /> <br /> <br />7. Removal of Debris and Cleanin0 - Commercial Land Use <br /> <br /> <br />An estimate of three employees working for four <br /> <br /> <br />days was made for each commercial unit inundated. An <br />
The URL can be used to link to this page
Your browser does not support the video tag.