Laserfiche WebLink
<br />CWCB FLOODPLAIN STUDY REVIEW <br />Community Contact Documentation <br /> <br />0/- S3O, <br />Res. No. 01- 5'-10 <br /> <br />Community Contact: <br />Date: <br />Community <br />Name: <br />Title: <br />Organization: <br />Phone Number: <br />Contact by: <br /> <br />-::fA"" 2>\ 'l-oO \ <br />IOu:>..,. . of 1'At-W1f,R- L>>4KE. <br />DE'-t-<-J4 &.,., :s <br />TO...:lr( ~"" <br /> <br />Time: <br /> <br />3\<10 ~"'^ <br /> <br />(II'}) "19/- Z'1S3 <br />G,t:oIU",E. .S'/..o~l<..:.sl'-."'" <br /> <br />Discussion Items: <br />. Provide information on the floodplain designation process. <br />Jm Notification letters were sent out by CWCB. Was the letter received? DYes D No <br />)if Montgomery Watson is contracted to CWCB to provide technical reviews of studies. <br />Ii( CWCB is considering designation of the streams in the study at its next board meeting on <br />:1....-:> 2-3>.?rI 20<> \ <br />/11 Community must respond with a letter requesting designation within 30 days of next <br />CWCB Board meeting. A sample was sent with the notification letter. Has the <br />community responded to CWCB with a letter? D Yes D No <br />)l!\ Tom Browning with CWCB will be in contact to coordinate a floodplain informational <br />meeting with the community. He can be contacted for further information at (303) 866- <br />3441. <br /> <br />. Provide information on regulatory issues. <br />;s, CWCB is required to assist in the prevention of floods and flood damages therefrom <br />~ Legislative bodies of local jurisdictions may provide zoning regulations for land uses on <br />or along any storm or floodwater runoff channel or basin only after designation and <br />approval of the study by the CWCB. <br />Jill CWCB has been directed to designate and approve storm or floodwater runoff channel or <br />basins and to make such designations available to legislative bodies of local jurisdictions. <br /> <br />. Solicit community input on the floodplain study to be reviewed including any known <br />floodplain mapping inaccuracies or other technical problems with the study. <br />CJ Has there been significant development within the community since the floodplain maps <br />were issued? <br />CJ Have other structures been constructed since the floodplain maps were issued? <br />CJ Have flood protection measures been implemented since the floodplain maps were issued <br />(dikes, reservoirs, operational policies)? <br /> <br />. Collect flood history and other information that would be helpful or pertinent to evaluating <br />the communities floodplain information. <br />CJ Have there been any significant historical floods? Is any documentation available. <br />CJ Have there been any recent floods? Are photographs or mapping available? <br />CJ Are there locations where flooding occurs regularly. <br /> <br />Page I <br />