Laserfiche WebLink
<br />CWCB FLOODPLAIN STUDY REVIEW <br />Community Contact Documentation <br /> <br />0/ - 5'39 <br />Res. No. 01-5'-10 <br /> <br />Community Contact: <br />Date: <br />Community <br />Name: <br />Title: <br />Organization: <br />Phone Number: <br />Contact by: <br /> <br />F;::e, z. I z.oo\ <br />"'Tb<..>,.. Of' \MON"'W\~T <br />v\1; \(E: C>.<I-\)~,;)p"jZ.-r J ~~.4"'AlI/,)'" <br /> <br />Time: <br /> <br />Z;f!)O <br /> <br />.i>,\'UO<:.:ll:>R- <br /> <br />(7,'1) "181- zHS''-/ <br />~1l4E- SLo"6..:)$\;.~ <br /> <br />Discussion Items: <br />· Provide information on the floodplain designation process. <br />Ji( Notification letters were sent out by CWCB. Was the letter received? /II! Yes 0 No <br />)II( Montgomery Watson is contracted toCWCB to provide technical reviews of studies. <br />\( CWCB is considering designation of the streams in the study at its next board meeting on <br />::J"vI 2b-1.4 ZOol . <br />o Community must' respond with a letter requesting designation within 30 days of next <br />CWCB Board meeting. A sample was sent with the notification letter. Has the <br />community responded to CWCB with a letter? 0 Yes 0 No <br />X Tom Browning with CWCB will be in contact to coordinate a floodplain informational <br />meeting with the community. He can be contacted for further information at (303) 866- <br />3441. <br /> <br />· Provide information on regulatory issues. <br />)1. CWCB is required to assist in the prevention of floods and flood damages therefrom <br />R Legislative bodies of local jurisdictions may provide zoning regulations for land uses on <br />or along any storm or floodwater runoff channel or basin only after designation and <br />approval of the study by the CWCB. <br />~ CWCB has been directed to designate and approve storm or floodwater runoff channel or <br />basins and to make such designations available to legislative bodies of local jurisdictions. <br /> <br />· Solicit community input on the floodplain study to be reviewed including any known <br />floodplain mapping inaccuracies or other technical problems with the study. <br />(J1.. Has there been significant development within the community since the floodplain maps <br />were issued? <br />jl( Have other structures been constructed since the floodplain maps were issued? <br />~ Have flood protection measures been implemented since the floodplain maps were issued <br />(dikes, reservoirs, operational policies)? <br /> <br />· Collect flood history and other information that would be helpful or pertinent to evaluating <br />the communities floodplain information. <br />)l( Have there been any significant historical floods? Is any documentation available. <br />'Ii( Have there been any recent floods? Are photographs or mapping available? <br />~ Are there locations where flooding occurs regularly. <br /> <br />Page I <br />