Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />SOMA-2 <br /> <br />FINAL SUMMARY OF MAP ACTIONS <br /> <br />Community: SUMMIT COUNTY · <br /> <br />Community No.: 080290 <br /> <br />To assist your community in maintaining the Flood Insurance Rate Map (FIRM),we have summarized <br />below the previous Letter of Map Change (LOMC) actions (i.e., Letters of Map Revision (LOMRs) <br />and Letters of Map Arnmendment (LOMAs}) that will be affected when the revise FIRM becomes <br />effective on 08/09/200 I. <br /> <br />1. LOMRs and LOMAs Incorporated <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will be reflected on the revised <br />FIRM, However, these LOMRs and LOMAs will remain in effect until the revised FIRM becomes <br />effective. <br /> <br />LOMC <br /> <br />Ca.. Ho. <br /> <br />Date <br />I.sued Project Identifier <br /> <br />Ne. <br />Panel <br /> <br />Old <br />Panel <br /> <br />2. LOMRs and LOMAs Not Incorporated <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will not be reflected on the revised <br />FIRM because of scale limitations or because the LOMR or LOMA issued had determined that the <br />lot(s) or structure(s} involved were outside the Special Flood Hazard Area, as shown on the FIRM. <br />These LOMRs and LOMAs will remain in effect until the revised FIRM becomes effective. These <br />LOMRs and LOMAs will be revalidated free of charge 1 day after the revised FIRM becomes effective <br />through a single letter that reaffirms the validity of the previous LOMC. <br /> <br /> Dat. Old N_ <br />LOMC Case No. I.sued Projeot Identifier Panel Panel <br />LOMA llO-08-269A 09/18/2000 SAGE CREEK CANYON SUBDIV, BLOCK 1, LOT 18- 08029001108 0802900107C <br />517 LARtAT lOOP <br />LOMA 01-08-003A 11/13/2000 PINEY ACRES FILING NO. 1 AMENDED, BLOCK 1, LOT 7 08029001108 0802900109C <br />- 532 UTILE BEAVER TRAIL <br /> <br />3. LOMRs and LOMAs Superseded <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will not be reflected on the final <br />revised FIRM because they are being superseded by new detailed flood hazard information or the infor- <br />mation available was not sufficient to make a determination, The reason each is being superseded is <br />noted below, These LOMRs and LOMAs will no longer be in effect when the revised FIRM becomes <br />effective. <br /> <br />01/22/01 <br /> <br />Pag.t 0'2 <br />