Laserfiche WebLink
<br />1.S Acknowledgments <br /> <br />This report was prepared by Greenhorne & O'Mara, Inc., Consulting Engineers of Aurora, <br />Colorado, under contract with the UD&FCD. Greenhome & O'Mara wishes to acknowledge <br />the various individuals who assisted in the preparation of the study. These individuals were <br />routinely coordinated with during the planning process. The following people participated by <br />providing technical guidance and information during the course of the study: <br /> <br />Name <br /> <br />Representing <br /> <br />Ben Urbonas <br />John Doerfer <br />Bill DeGroot <br />Brad Robinstein <br />Mike Goldhammer <br /> <br />Urban Drainage and Flood Control District <br />Urban Drainage and Flood Control District <br />Urban Drainage and Flood Control District <br />Douglas County <br />Denver Water Board <br /> <br />The following members of the project team contributed to the preparation of this report: <br /> <br />Greenhorne & Q'Mara. Inc. <br /> <br />Penn Gildersleeve <br />Douglas Williams <br />Matthew Ursetta <br />Curt Neufeid <br />Dan Bernier <br /> <br />Principal-in-Charge <br />Project Manager <br />Project Engineer <br />Hydrology/Hydraulic Engineer <br />T echnicianlDrafting <br /> <br />ERO Resources, Inc. <br /> <br />Steve Dougherty <br />Mark DeHaven <br /> <br />Environmental Task Manager <br />Natural Resource Specialist <br /> <br />2 <br />