My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01902
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:09:07 PM
Creation date
10/4/2006 10:26:53 PM
Metadata
Fields
Template:
Floodplain Documents
County
Pitkin
Community
Aspen
Title
Drainage Facility Capacity Analysis of City of Aspen
Date
9/1/1998
Prepared For
Aspen
Prepared By
WRC Engineering, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />where: <br /> <br />Q, <br /> <br />AI <br /> <br />= <br /> <br />Known flow from SWMM downstream from location <br />2 <br />Drainage area input to SWMM at point downstream <br />oflocation 2 <br />Drainage area at point location 2 (planimetered) <br />Flow at location 2 <br /> <br />= <br /> <br />A, <br />Q, <br /> <br />= <br /> <br />= <br /> <br />Table 8 shows the flow at each of the sub-routes or City drainage facilities for the 2-year, 5-year, <br />la-year, 50-year, and lOa-year storm events, <br /> <br />Table 6 provides the capacity of the major storm sewers in the City of Aspen, which correspond <br />to a drainage reach, For the purposes of this study a major storm sewer was defined as having an <br />18- inch diameter or greater, The exception to this was the 18- inch storm sewer on Hopkins from <br />Hunter to Spring. Due to its short length and small drainage area, this storm sewer was defmed as <br />a lateral and was not included in the analysis. <br /> <br />Table 7 supplies the capacity of the street flow along the drainage reaches, It was assumed, forthe <br />purpose of this preliminary analysis, that the street flow would be limited to a 6-inch depth at the <br />curb, No flow into the adjacent yards would be permitted, It was further assumed that the cross <br />slope of the streets was 2%, The street width was scaled from the Figures 7 and 8, <br /> <br />If the street does not have curb and gutters and runoff would flow into garages along the street, <br /> <br /> <br />there will actually be no street flow capacity, and the total capacity will be the storm sewer <br /> <br /> <br />cl1pacity . <br /> <br />F, RESULTS <br /> <br />Based on a comparison of the magnitude of the flow events for a given return period to the capacity <br />of the existing drainage facilities it appears that: <br /> <br />The capacity of the drainage system along Original Street is insufficient to convey the 50-year and <br />the laO-year storm events, The storm sewer, alone, should be able to transport the 5-year flow <br /> <br />event. <br /> <br />The drainage facilities along Spring Street south of Main Street are unknown at this time, The <br /> <br />5 <br /> <br />; <br />:.- <br /> <br />,.-..11 <br />~--I ' <br /> <br />, <br />, , <br />
The URL can be used to link to this page
Your browser does not support the video tag.