Laserfiche WebLink
<br />C-11 <br /> <br />COMMENTARY ON SHEET 4 <br /> <br />Reach 2 <br /> <br />COST ESTIMATE <br /> <br />Reach 2 <br /> <br />Station 750+00 to Station 800+00 <br /> <br />Station 750+00 to Station 800+00 <br /> <br />CONSTRUCTION <br /> <br />No serious flood hazard exists in this portion of Reach 2 and therefore the <br />recorrmended management strategy is Floodpl ain Regul ation. <br /> <br />Channel Improvement Costs <br /> <br />The frontage road between Colorado Route 58 and Clear Creek provides good <br />access for maintenance of the channel. <br /> <br />util ity Relocation Costs <br /> <br />TOTAL CONSTRUCTION COSTS <br /> <br />ENGINEERING AND CONTINGENCIES (30% of Construction Costs) <br /> <br />FISCAL, LEGAL AND ADMINISTRATIVE (10% of Above Total) <br /> <br />PROPERTY ACQUISITION COSTS <br /> <br />MAINTENANCE <br /> <br />TOTAL IMPRuVEMENT COSTS <br />(1981 Doll ars) <br /> <br />Annual Operation/Maintenance Cost <br /> <br />-0- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />-0- <br /> <br />-0- <br /> <br />-0- <br /> <br />-0- <br /> <br />-0- <br /> <br />-0- <br /> <br />$ 18,500.00 <br />